Share your project details and we'll reach out to
Smith, Timothy Scot
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Smith, Timothy Scot at 750 MONROE ROAD, Sanford, FL 32771, held a General Contractor license (#CGC1532109) with the Florida contractors license board with an expiration date of 08-31-2026. We last verified the license was inactive on 07-26-2025.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 191,428 Florida contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.
Expansion of the hillsborough county south county wastewater treatment plant to 13 mgd. includes construction of a new headworks influent box miscellaneous equipment replacements two new 85 clarifiers new ras and was pump stations clarifier splitter box expansion two new electric buildings and replacement of the existing reclaimed high service pumps
Expansion of the hillsborough county south county wastewater treatment plant to 13 mgd. includes construction of a new headworks influent box miscellaneous equipment replacements two new 85 clarifiers new ras and was pump stations clarifier splitter box expansion two new electric buildings and replacement of the existing reclaimed high service pumps
Expansion of an existing wastewater treatment facility inclusive of a new chlorine contact basin deep bed filters chemical systems pump replacements electrical controls and stormwater improvements
Early foundation permit for auger cast piles at two new clarifiers micropiles at the new headworks influent box and micropiles at the new addition to the clarifier splitter box
The project will expand the existing water reclamation facility to accommodate additional capacity. the project will include construction of ground storage tanks electrical building pump station metering station and stormwater infrastructure
This permit if for administration building and site work for the phase i hamlin water reclamation facility (wrf). the hamlin wrf is a proposed greenfield 5 mgd water reclamation facility to serve the southwest services area of the orange county utilities department. shop drawings must be provided for guard shack prior to inspection. refund of fees paid by contractor on 1/8/2020 due to... see more
This permit is for the construction of the phase i ast tanks 1 and 2 (combined structure) for phase i treatment for the hamlin wrf. refund of fees paid by contractor on 1/8/2020 due to inter-fund transfer processed on 8/27/2019-8/28/2019. see fos refund attached
The chemical conversion and reliability improvements project (ccrip) will provide several upgrades to the city of cocoa's claude h. dyal (dyal) water treatment plant (wtp) located at 28400 fl 520 christmas fl in orange county. please refer to the project narrative submitted with this application. chemical facility #1 is a pre-engineered metal structure that is partially enclosed. sodi... see more
Construction of a new wasterwater pump station including a wetwell with four 3 000 gpm pumps electrical building with electrical and controls equipment generator fuel storage tank and odor control equipment. refund of fees paid by contractor on 1/14/2020 due to inter-fund transfer processed on 7/15/2019. see fos refund attached
This permit is for the construction of the concrete sludge and thickened sludge holding tanks 1 2 3 and 4 for the hamlin wrf. the tanks consist of concrete structures with a stainless steel cover and aeration equipment for sludge mixing. refund of fees paid by contractor on 1/8/2020 due to inter-fund transfer processed on 8/27/2019-8/28/2019. see fos refund attached
This permit is for construction of the phase i blower/main electrical/generator building for the hamlin wrf. refund of fees paid by contractor on 1/8/2020 due to inter-fund transfer processed on 8/27/2019-8/28/2019. see fos refund attached
This permit is for construction of the high service pump station for the hamlin wrf. this station is a concrete slab to support canned vertical turbine pumps. refund of fees paid by contractor on 1/8/2020 due to inter-fund transfer processed on 8/27/2019-8/28/2019. see fos refund attached
This permit is for construction of the chlorine contact tanks cct splitting structure and effluent pump station which is a singe concrete structure with open top for the hamlin wrf. refund of fees paid by contractor on 1/8/2020 due to inter-fund transfer processed on 8/27/2019-8/28/2019. see fos refund attached
This permit is for construction of the sodium hypochlorite storage facility for the hamlin wrf. this is a pre-engineered building with fire protection. refund of fees paid by contractor on 1/8/2020 due to inter-fund transfer processed on 8/27/2019-8/28/2019. see fos refund attached
This permit is for construction of the filter flow splitting channel and filter structure for the hamlin wrf. the filter structure is an open top buried concrete structure which will house the future disk filters. refund of fees paid by contractor on 1/8/2020 due to inter-fund transfer processed on 8/27/2019-8/28/2019. see fos refund attached
This permit is for construction of clarifier no.3 of the hamlin wrf phase i. this is a circular concrete tanks with open top with self cleaning mechanism. it also includes a concrete pad to support the return and waste activated sludge pumping station no.2
This permit is for construction of clarifier no.2 of the hamlin wrf phase i. this is a circular concrete tanks with open top with self cleaning mechanism. refund of fees paid by contractor on 1/8/2020 due to inter-fund transfer processed on 8/27/2019-8/28/2019. see fos refund attached
This permit is for construction of clarifier no.1 of the hamlin wrf phase i. this is a circular concrete tanks with open top with self cleaning mechanism.this is a circular concrete tanks with open top with self cleaning mechanism. it also includes a concrete pad to support the return and waste activated sludge pump station no.1. refund of fees paid by contractor on 1/8/2020 due to in... see more
According to the Florida Department of Business & Professional Regulation, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Smith, Timothy Scot at the Florida Department of Business & Professional Regulation.
This is a sample of licensing data; click here to access a complete history.