Share your project details and we'll reach out to
Solar Installation Group Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Solar Installation Group Inc, Oakdale, Po Box 265, Oakdale, CA (Employees: Aaron Michael Kerr, Jared Linn Kerr, and Paul Ryan Kerr) holds a Solar, Electrical license according to the California license board.
Their BuildZoom score of 111 ranks in the top 4% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Solar Installation Group Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Change to # of panels installed (from 26 to 23) change in panel layout change in ess (from 1x enphase 10 to 4x enphase 5p's) homeowner upgraded to a (e) 400a msp [not completed bu sig] breaker size changes on 3line # of strings from 3 to 2 with reduced system size to 9.43kw. no change in valuation
** 11.18kw 26 pane;s + battery ** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Revision: 1. we had to move the batteries b/c of ahj requirements. still the same 4x enphase batteries. also a breaker changed - we have moved the battery and battery combiner according to your provided location and split the battery breaker in 4-20a breaker for individual batteries
Revisions to wiring due to homeowner's existing generac generator on site. all changes have been bubbled in the plans on the tld page(s). 1. generac ats added fed from msp. 2. solar landed in msp with a load side tap. 3. 30a air conditioning disco not installed opcd breaker in the enphase encharge and in the enphase iq system for disconnects. 4. enphase ess installed
E-permit: residential - 7.400kw photovoltaic system main breaker replacement: - no battery backup units: - 0. e-permit: revision record id: bp22-11542.rev01 revision description: at install an air conditioning disconnect and line side tap was required main breaker replacement: no
Install a 10.560 kw (dc) roof mounted photovoltaic array with battery back up. (24) silfab prime sil-440 qd solar modules and (02) ecoflow ocean pro storage batteries (10kwh) each
Revision: changed location of ocean pro inverter on page 2 changed breaker in main and wire on page 4 and changed breaker and wire size on page 5. please see revision letter
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
**mpu 125a ** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection **see attached inspection policy***
** 200a msp ** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
1.) changed 200a new subpanel to 100a existing subpanel on page 4. 2.) added a 50a a 60a breaker and a 100a bw breaker to agate on page 4. 3.)removed apbox on page 4
**125amp mpu*** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection **see attached inspection policy***
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection **see attached inspection policy***
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection **see attached inspection policy***
**mpu upgrade 125 amp** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection **see attached inspection policy***
Ch-01=revisions to wiring due to homeowner's existing generac generator on site. all changes have been bubbled in the plans on the tld page(s). 1. generac ats added fed from msp. 2. solar landed in msp with a load side tap. 3. 30a air conditioning disco not installed opcd breaker in the enphase encharge and in the enphase iq system for disconnects. 4. enphase ess installed