Want a quote from
SOURCE PLANNING AND CONSTRUCTION INC?
We recommend getting 3 quotes
for any construction project.
Use our
free bidding system
to get a quote from SOURCE PLANNING AND CONSTRUCTION INC
+ 2 more of the best.
SOURCE PLANNING AND CONSTRUCTION INC, 909 Montgomery St, San Francisco, CA (Employees: Bryce Porter Harstad, Christopher John Demos, and Samuel Austin Perry) holds a General Building license according to the California license board.
Their BuildZoom score of 114 ranks in the top 2% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring SOURCE PLANNING AND CONSTRUCTION INC, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Pro tip:
We generally recommend hiring a contractor with a score higher than 95.
SOURCE PLANNING AND CONSTRUCTION INC has a BuildZoom score of 114, which places them above 98% of 336,931 contractors in California.
Activity
25 projects
2025
18 projects
2024
23 projects
2023
16 projects
2022
Our building permit records indicate that SOURCE PLANNING AND CONSTRUCTION INC has worked on at least
82.0 projects over the past 3 years.
This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.
Experience
29 projects
Commercial Renovations
12 projects
Home Additions
6 projects
New Constructions
Analyzing permits over the last 4 years shows that SOURCE PLANNING AND CONSTRUCTION INC mostly works on
commercial renovation
and home addition
projects.
Pricing
19 projects
< $5k
7 projects
$5k-$20k
9 projects
$20k-$50k
8 projects
$50k-$100k
18 projects
$100k-$250k
16 projects
$250k-$500k
19 projects
$500k-$1mil
14 projects
$1mil+
Value Not Public: 3.0 projects
The typical size of their permits is approximately $144,642. This graph shows the distribution of these job values.
Pro tip:
For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.
Building Permits by SOURCE PLANNING AND CONSTRUCTION INC
7/f: demolish of non-structural elements. construction of (2) all gender restrooms wellness room lounge (2) phone rooms finsihes ceilings and lighting. mep life safety sprinkler under separate permit. path of travel and restrooms approved # 202308305609 and 202409261645
Scope of work on 7th floor interior demolition of non-structural elements. construction at new interior partitions. new break copy room. 5 phone rooms and u conferences. mep life safety and sprinkler plans will be separate permit. path of travel previously approved 202308305609
Scope of work on 11th fl. interior demolish of non structural elements. construction of new offices conference rooms break areas and storage. new ceilings lighting and finishes throughout. mep fire alarm sprinkler will be separate permit. path of travel previously approved 202308305609
Scope of work on 11th fl. interior demolish of non structural elements. construction of new offices conference rooms break areas and storage. new ceilings lighting and finishes throughout. mep fire alarm sprinkler will be separate permit. path of travel previously approved 202308305609
24th floor/suite 2400: (e) t.i.: demolish and construction of non-loading bearing partitions; (n) partitions (n) ceiling title and grid system; open ceiling condition led light fixtures and switches power and signal; (n) doors/frames/hardware millwork and finishes. include mep. all other required
Suite 550 new tenant's office tenant improvement of 4 400 sq ft no calcs ** issue certificate of occupancy ** scope of work: 1) demolish and addition partition walls to create reception open office area private offices **04/24/25 - revision delta 1 minor electrical changes
Suite 2500 25th fl: interior demolish of non structural element including but not limited to partitions doors finishes lighting mechanical & electrical. construct 5 new offices and 1 wellness room. mep & life safety & sprinkler plans to be submitted seperately. no extension building site landscape use or parking proposed
Suite 2500 25th fl: interior demolish of non structural element including but not limited to partitions doors finishes lighting mechanical & electrical. construct 5 new offices and 1 wellness room. mep & life safety & sprinkler plans to be submitted seperately. no extension building site landscape use or parking proposed
8/fl- suite 825 and 850- involves modification of (e) tenant improvement to include selective construction and demolish of non load bearing partitions. modification to (e) ceiling grid and tile light fixtures relocation and (n) inlcuding re switching (n) office doors and grames salvage and reuse of (e) selected
T.i.: el porteno"; addition service counter on the adjacent nave side niche within kiosk space with (n) equipment and hand sink based on dph report on 10/27/23 (signage to be submitted separately under deferred permit) ferry building space k4
8/fl- selective interior demolish in 2 suites and new construction in one suite only including: interior partitions doors finishes ceilings etc. no changes to exterior building site landscape use or parking and building structure are proposed
3rd fl. demolish under 202508213610. tenant improvement. includes the bldging of new non-structural partitions. all new or revised meps life safety/sprinklers will be design building and submitted. separately. (bldg is fully sprinklerd)
Floor/20- ste 2020 consist of minor demolish of non structural elements including paritions doors lighting and ceiling. construction at pantry and copy area. (n) ceiling lighting and finishes. mep life and safety sprinkler under seperate permit. includes restroom upgrades and path of travel
Floor/20- ste 2020 consist of minor demolish of non structural elements including paritions doors lighting and ceiling. construction at pantry and copy area. (n) ceiling lighting and finishes. mep life and safety sprinkler under seperate permit. includes restroom upgrades and path of travel
Floor/20- ste 2020 consist of minor demolish of non structural elements including paritions doors lighting and ceiling. construction at pantry and copy area. (n) ceiling lighting and finishes. mep life and safety sprinkler under seperate permit. includes restroom upgrades and path of travel
Hvac scope selective demolish and ap install new air distribution ductwork relocate tstat per floor plan. air balance. electrical scope: new power and signal devices throughout space and new 2022 title 24 comopliant lighting and controls ref 202502100012
T.i.: tishman speyer - canyon spec office suite 203"; (n) open office (4) conference rooms (2) phone rooms (1) meeting room and break area (fa and sp to be submitted separately under deferred permits) swl 337 building a
T.i.: tishman speyer - canyon spec office 202"; office tenant improvement. includes limited interior non-structural demolish. construction of (n) demising common corridor and suite 202 office space. suite 202 consists of (n) open office (3) conference rooms (2) phone rooms (1) meeting room and break area swl 337 building a
Basement - interior demolish of non-structural elements including partition doors finishes ceiling and lighting. construction of new exercise room storage showers finishes and ceiling and lighting. mep life safety & sprinklers under separate permit. no hot tub juice bar and no change in occupancy