South Lyon Plumbing, 22609 Sandra St, South Lyon, MI (Employees: Christopher Kluck, Christopher P Kluck, and Larry Cossin) holds a Mechanical Contractor license and 11 other licenses according to the Michigan license board.
Their BuildZoom score of 106 ranks in the top 7% of 167,179 Michigan licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring South Lyon Plumbing, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
Mechanical for gas pressure for construction of a 1 story 18 x 20 with post and footing construction to be used as a 4 season room. ***all exterior walls to be frame as portal frame - see attached code details. minimum 12 opaque walls each side of multiple window openings ***
Gas piping & pressure for 80 x 70 pole barn with two overhead doors and one service door **existing two car detached garage to be demoed prior to final building **
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line
Install right side yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Install subsoil to sump crock sanitary to 11 outlets on u.g for: new 2 story b use building with full unfinished basement. accessible entrance and parking required per 2009 ansi and chapter 11 2015 mbc. ada compliant restrooms and ada compliant break room areas. 3rd party inspection and reports for all soil bearing concrete work and structural steel
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line
Movement of 3 supply ducts for hvac system for: converting an existing gym into massage parlor. building partion walls for approx. 10 rooms drop ceilings installed in each room. new hvac runs. electrical/lighting emergency back up lighting smoke detectors. new carpet and paint walls **revised door heights jl 12-5-22**
22 kw stand by generator and support hardware per attached approved plan. minimum 3 feet from solid fence and minimum 5 ft from any openings in structure per attached 340-39.1
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line
Install stand-by generator located in the side yard immediately adjacent (maximum 36 clearance) to the residential building. unit must be screened from view with evergreen plantings according to the township code of ordinances. generators must register not more than 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Install stand-by generator located in the side yard immediately adjacent (maximum 36 clearance) to the residential building. unit must be screened from view with evergreen plantings according to the township code of ordinances. generators must register not more than 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Stand-by generator located in the side yard immediately adjacent (maximum 36 clearance) to the residential building. unit must be screened from view with evergreen plantings according to the township code of ordinances. generators must register not more than 70 db(a) noise level at the closest property line 1 insp
Stand-by generator located in the side yard immediately adjacent (maximum 36 clearance) to the residential building. unit must be screened from view with evergreen plantings according to the township code of ordinances. generators must register not more than 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
This is a sample of licensing data; click here to access a complete history.
Inactive License
License #
313287
Status
Inactive
State
Michigan
Type
Boiler Installer
According to the Michigan Department of Licensing & Regulatory Affairs, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for South Lyon Plumbing at the Michigan Department of Licensing & Regulatory Affairs.
This is a sample of licensing data; click here to access a complete history.
Inactive License
License #
313287
Status
Inactive
State
Michigan
Type
Boiler Installer
According to the Michigan Department of Licensing & Regulatory Affairs, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for South Lyon Plumbing at the Michigan Department of Licensing & Regulatory Affairs.
This is a sample of licensing data; click here to access a complete history.
Inactive License
License #
CONT-140089
Status
Inactive
City
Ann Arbor
Type
Contractor
According to the The City of Ann Arbor, MI, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for South Lyon Plumbing at the The City of Ann Arbor, MI.
This is a sample of licensing data; click here to access a complete history.