Spano Thomas Greywolf Electric at Philadelphia, PA 19019, held a Electrician license (#45598) with the Philadelphia contractors license board with an expiration date of 06-29-2024. We last verified the license was expired on 08-05-2025.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 125,106 Pennsylvania contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our bidding system to be easily matched to qualified, licensed professionals in your area.
Install a 500kva transformer (1) 1600 amp ldp panel & feeder (2) 600 amp panels & feeders (2) 800 amp panels & feeders (9) 200 amp panels & feeders (41) 150 amp panels & feeders on the existing service. install wiring throughout the common areas and (50) dwelling units. install lighting normal & emergency switches sensors receptacles, & smoke alarms. provide power for the mechanical a... see more
Design of new electrical service. design of led lighting throughout facility with lighting controls. design of electrical connections to mechanical equipment. design of a backup generator set and automatic transfer switch. design of a separate fire pump service and connections. design of grounding electrode system and connections as per 2017 nec. amendment: change 3rd party electric i... see more
Install 480v 600a electrical system inside building including interior/exterior lighting outlets fire alarm appliances all work is to be done according to approved drawings-2017 nec, 2016 nfpa 72, 2018 phila fire code
Electric: install wiring for mercantile(grocery outlet) w all lighting em.lighting , equipment hook-ups, 480/208 trans, 208v panels. all work is to be done according to approved drawings-2017 nec. **separate fire alarm permit is req'd**
New construction of a seven (7) story structure with a roof deck accommodating one hundred eighty (180) dwelling units as per approved plans. level 3 through 7 to be modular construction – type iiia. scope of work to include the following; complete 13.2kv service (1) 1725kva transformer (1) 112.5kva transformer for fire pump all panel boards and disconnects all wiring devices and ligh... see more
Rough-in permit for ep-2022-004821 conversion of senior living building to apartments. new switchboard panelboards and 500 kva transformer off existing service. new loadcenters breakers and feeder cables for apartments. new lighting devices and associated wiring within apartments and hallways. new addressable fire alarm system. all devices and wiring. all work per nec 2017 and nfpa72
Electrical work for new tenant fit out 1200a service, mdp, including new lighting new outlets power for new heating units data new fire alarm system/panel new fire alarm. all work is to be done according to approved drawings. -2017 nec, 2016 nfpa-72, 2018 phila fire code. -noted:el.rm.dr. to be equipped w listed panic hardware(110.26(c)(3) 17 nec)
Complete electrical install for new cvs. all devices and associated wiring all lighting and associated wiring all wiring and connection of mechanical units. new 600 amp service with (2) subpanels. no fire alarm. all work per nec 2017
All lighting devices and associated wiring for: hallways and basement area. wiring and connection of roof mounted and indoor hvac units. install all required lighting receptacles outlets smoke alarms and fire alarm notification appliances in all units-as per 17 nec and 2018 phila fire code. (no exemptions) wiring and connection for (1) elevator. new electrical service consisting of (2... see more
Installation of fire alarm system - cables devices and panels associated with a full fire alarm installation , notification appliances all smoke automatic smoke detection and wp heat detector at elevator lobby on roof. all work is to be done according to approved drawings-2017 nec, 2016 nfpa-72, 2018 phila fire code
Electrical site work only. installation of new transformer vault manhole primary conduit and cable secondary conduit and cable site light conduit cable conduit and cable for future compactor and meter pit. no main disconnect. all work to adhere to nec 2017
All wiring devices and lighting fixtures for (88) apartment dwellings. all wiring devices and lighting fixtures for amenity spaces and common area hallways. electrical service consisting of: (1) 1200 amp house service (1) 1200 amp service serving the apartments (1) 1600 amp service serving the apartments (1) 1600 amp service serving the commercial spaces (1) 200 amp fire pump service.... see more
Modular constructed 6 floor apartment building with roof deck. all apartments are pre fab. scope of work to include: complete 13.2kv service. (2) 1500 kva substations (1) 112.5 kva substation for fire pump. all wiring devices and lighting for (44) conventionally built apartments. all wiring devices and lighting for garage hallways exterior and roof deck as per 2017 nec
Install new fire alarm system throughout as per 2016 nfpa 72. install new security alarm system new telephone system with low voltage cables new speakers with low voltage cables installing new data rack as per 2017 nec
The electrical contractor shall: provide and install all conduits wires boxes outlets for all lighting receptacles mechanical refrigeration and plumbing equipment. installing all new led lighting exit signs emergency power packs and lighting controls as shown on plan. provide and install new subpanels feed from a 1200a mdp at 208/120v in the basement. electrical contractor shall provi... see more
Install a new silent night 6700 series fire alarm system including pull stations horn strobes. monitors and relays and all associated wiring. -noted: strobe req"d in break room. all work is to be done according to approved drawings-2017 nec, 2016 nfpa-72, 2018 phila fire code
Work only on 1st floor and basement - addition 6 new fire alarm devices to existing system as per 2016 nfpa 72. all low 50 volt cameras in 45 data locations. all other low volt cabling require (2) 96 port data racks as per 2017 nec
Install a 600 amp service (1) 200 amp panel & feeder (1) 125 amp panel & feeder. install wiring for lights switches sensors ems receptacles mechanical & hvac equipment. install duct bank for the electric service. install the site lighting all wiring as per the 2017 nec. ** no fire alarm work.**
Complete removal of old wiring and devices. installation of new wiring devices and lighting fixtures. addition/remodel of kitchen/bath. hardwired smoke detectors. new 200amp overhead service. all work per nec 2014
According to the City of Philadelphia Licensed Contractors, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Spano Thomas Greywolf Electric at the City of Philadelphia Licensed Contractors.
This is a sample of licensing data; click here to access a complete history.