Their BuildZoom score of 112 ranks in the top 3% of 62,733 Oregon licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Superior Underground LLC, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
Contractor to replace existing lateral from property line to face of curb per city standard p-262; pbot note location trenching. contractor must verify depth/location and downstream connection point to public system in the field
Contractor to replace existing lateral from property line to face of curb per city standard p-262; pbot note location trenching. contractor must verify depth/location and downstream connection point to public system in the field
Contractor to replace existing lateral from property line to face of curb per city standard p-262; pbot note location trenching. contractor must verify depth/location and downstream connection point to public system in the field
Contractor to replace existing lateral from property line to face of curb per city standard p-262; pbot note location trenching. contractor must verify depth/location and downstream connection point to public system in the field
Contractor to replace existing lateral from property line to face of curb per city standard p-262; pbot note location (trench). contractor must verify depth/location and downstream connection point to public system in the field
Contractor to replace existing lateral from property line to face of curb per city standard p-262; pbot note location (trench). contractor must verify depth/location and downstream connection point to public system in the field
Contractor to replace existing lateral from property line to face of curb per city standard p-262; pbot note location (trench). contractor must verify depth/location and downstream connection point to public system in the field
Please contact public works inspector jake ashenberner at 971-276-1751 or [email protected] 72 hours prior to start of work. inspections must be scheduled 24 hours prior to start of work. maintain sanitary/storm separation (10 horiz.) (18 vert.) and sanitary/water separation (10’ horiz.) (18” vert.). services shall be 5 feet minimum from a manhole and 18 inches minimum from anot... see more
Work was perimtted under pu-24-00025. 19575 sebastian way new sewer connection please contact public works inspector jake ashenberner at 971-276-1751 or [email protected] 72 hours prior to start of work. inspections must be scheduled 24 hours prior to start of work. maintain sanitary/storm separation (10 horiz.) (18 vert.) and sanitary/water separation (10’ horiz.) (18” vert.). ... see more
San conn: 227 lf of 9 cipp main (approx. d=15') in sw 4th ave. contractor connect to existing branch per standard p-262 (approx. l=39 d=7') located approx. 83 from us smh asd165. contractor must verify depth/location and downstream connection point to public system in the field. contact x31026
San conn: 275 lf of 9 var main approx d=10.3 in sw jefferson st. contractor shall building new 6 branch per standard p-262 and core drill tap smh abq513 (approx d=10.3') install (1) 6 clean-out @ curb and (1) 6 clean-out near face of building. ref bes detail p-257 & p-261. contr to verify all depths and locations in field. contact x31026
New 4 000 sf ag building bathrooms will gravity feed from building to new 1000 gallon dosing tank with hi head pump. liquids will be pumped to existing leach lines on existing 1500 gallon concrete septic tank. all work to be installed as per current code requirements
San conn: 173 lf of 8 csp main approx. d=9 in sw 25th ave. contractor to install 8"x6 tee into 8 main and prepare 6 branch to property per standard p-262. contractor must verify depth/location and downstream connection point to public system in the field. contact x31026
Replacing existing sewer line from back of home out to front of home on right side approx. 70ft using 4 inch hdpe via bursting method. installing new 1 inch wirsbo pipe water line from meter box in row to home foundation approx. 40 ft via drilling method
San conn: 135 lf of 8 pvc main (approx. d=14.5') in ne columbia blvd. contractor connect to existing 6 branch per standard p-262 (approx. l=45 d=12') located approx. 165 from us smh (any217) located in the intersection of ne columbia blvd & ne 29th ave. contractor must verify depth/location and downstream connection point to public system in the field. contact x31026
San conn: 250 lf of 8 csp sanitary main approx d=8 in ne 152nd. contractor shall building new branch per standard p-262 and core drill tap 8 main. contractor must verify depth/location and downstream connection point to public system in the field contact x31026
Replacing sewer line from home foundation to face of city curb via bursting method using 4 inch hdpe pipe & 4 inch 3034 pvc in row. we are installing catch basin in driveway in front of garage door with tie into sewer with p-trap & 3 inch abs pipe
Contractor to replace existing lateral from property line to face of curb per city standard p-262; pbot note location bursting trenching. contractor must verify depth/location and downstream connection point to public system in the field
Contractor to replace existing lateral from property line to face of curb per city standard p-262; pbot note location (trench/burst). contractor must verify depth/location and downstream connection point to public system in the field