Share your project details and we'll reach out to
Tanner City Contractors
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Tanner City Contractors, Salem, Po Box 753, Salem, MA (Owned by: Kenneth Mackenzie) holds a Home Improvement Contractor license according to the Massachusetts license board.
Their BuildZoom score of 90 indicates that they are licensed or registered but we do not have additional information about them.
Their license was verified as active when we last checked. If you are thinking of hiring Tanner City Contractors, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
To strip 1 layer of roof shingles on rear main roof only.dispose of debris at dump.apply an ice & water shield membrane on roofboards, dripedge flashings & lifetime architect asphalt roof shingle on roofs.new flanges on soil pipes, & remove & board old skylite
Apply a fully adhered rubber roof system on main flat roof of building.apply wood nailer on edges a 1 rigid insulation board fastened to deck with plates & screws, then adhere a 060mil rubber membrane & fasten a bronze aluminum metal edge flashing on edges & seal with rubber flashings. seal all penetrations & drains with flashings also
Strip existing roof shingles on all roofs & dispose of debris at dump. then apply an ice & water shield membrane, tarpaper, dripedge flashings & lifetime architect asphalt roof shingles & caps on ridges. ridge vent on main ridges
Strip existing shingle roofs from pitched roofs & dispose of debris at dump.then apply an ice & water shield membrane, tarpaper, dripedge flashings, & 30 year asphalt roof shingles.remove rear chimney not in use to roof line, board hole & shingle over
Install a fully adhered rubber roof on rear 3 sections of flat roofs.clean all debris, dirt & stone from roofs & edge flashings.then apply p.t. wood nailer, 1 iso insulation board & adhere a 060mil rubber membrane, run up walls under siding, & new white aluminum edge flashings & rubber flashings
Strip existing asphalt roof shingles & dispose of debris at dump.install an ice & water shield membrane, tarpaper, dripedge flashing, & asphalt roof shingles on roofs & caps on ridges
Strip existing layer of roof shingles & dispose of debris at dump.ibnstall ice & water shield membrane, tarpaper, dripedge flashings & architect roof shingles.ridge vent on main ridge
Clean stone from existing roof, apply a new fully adhered rubber roof with 1 isocyanurate rigid insulation board , wood nailer , adhere 060mil rubber membrane & new white aluminum edge flashings