Removing one wall and expanding the kitchen by approx. 300sf. mostly relocating the dishwasher line to create more usable space matching existing finishes and styles. cut out a pass through opening at serving line.remove the wall connecting the existing kitchen and adjacent storage room. relocate the dishwasher and sink into the storage area that will be part of the kitchen.install ss...
see more
Remodeling to the royal palm shorecrest tower and lanai as follows: remodeling to royal palm entry drive. pedestrain drive 1st floor ballroom plaza deck pool deck areas & 2nd floor. restaurant & kitchen modification to 2nd floor pool deck lanai with hotel conversion of (3) existing 1st floor guestrooms into a fitness club. shorecrest tower remold 1st floor office & gift shop area. co...
see more
Tco for interior remodeling of a historic lobby to be converted to a restaurant/lounge. close out all open permits and address any outstanding revisions. address u.l. listing and labeling of lights in question. gs need all trades approval and final building 1195 or 1199 in the final. engineering inspection for trashroom will be conducted on 12/28/12
Bv12000491/...work entails building temporary partitions to isolate constuction activity from guest use and exploratory demolition moving the full removal of ballroom acoustic ceilijng system including lights speakers and vents
Cc for remodeling to the royal palm, shorecrest tower and lanai as follows: remodeling to royal palm entry drive. pedestrain drive 1st flr ballroom, plaza deck, pool deck areas & 2nd flr. restaurant & kitchen , modification to 2nd flr pool deck, lanai with hotel conversion of (3) existing 1st flr guestrooms into a fitness club. shorecrest tower remold 1st flr office & gift shop area. ...
see more
Tcc for elevator reconstruction, mechanical system installation, grease trap expansion and related electrical and structural work for the shore crest hotel lobby area. close out all open permits and address any outstanding revisions. address u.l. listing and labeling of lights in question. gs need all trades approval and final building 1195 or 1199 in the final.
Tcc for interior renovation of bldg # 3 shorecrest tower all common areas including lobby, back of the house space up to area designated as chef's office and retail adjacent to lobby and breezeway from lobby to the end of prefunction space. note: all units renovation for the shorecrest are under permit b1105403 and under separate tcc ( see bcc13011 ) not included as part of bcc13014: ...
see more
Tco for conversion of 3 existing 1st floor guestroom into fitness center in lania bldg & conversion of existing laundryroom into super cabana/bar & lounge room in the shore crest tower. note: jimmy's bar is not included in this tco
Tcc for stair # 5 and 1st floor office and gift shop area in the shore crest tower note: 1.- the gound level pool, spa & plunge pool are part of bco13042 2.- excluded from this tcc: area around pool bar and dining area (jimmy bar)
St. moritz - guestroom int rnvtn only. guest room (nw stone floring nw surface mounted decorative ligh fix nw vinyl base crwn molding @ ceiling) bathroom (stone flooring plumbing fitting @ nw shower nw vanity sink & plumbing fitting nw toilet nw vanity light fix nw bathroom door nw recessed dwn lights in ceiling)
Tower - guestroom int rnvtn only. guest room (nw stone floring nw recessed dwn light @ entry skim coat exst ceiling vinyl wall covering on bed wall vinyl base crwn molding @ ceiling) bathroom (stone flooring nw stone tile @ tub 426 rooms building nw shower pan in place of exst tub nw stone flooring on nw shower pans plumbing fitting @ nw shower nw bth tubs & plumbing fitting in remain...
see more
Permit includes: elevator reconstruction mechanical system installation grease trap expansion and related electrical and structural work
Co for conversion of 3 existing 1st floor guestroom into fitness center in lania bldg & conversion of existing laundryroom into super cabana/bar & lounge room in the shore crest tower.
Pcc for 16th floor only all units restrooms & hallways renovation on main tower. total # of units for this floor 46, excluding 1649 & 1655 units breakdown as per customer matrix are as follow below: 1601, 1603, 1604, 1605, 1606, 1607, 1608, 1609, 1610, 1611, 1612, 1613, 1614, 1615, 1625, 1627, 1628, 1629, 1630, 1631, 1632, 1633, 1634, 1635, 1636, 1637, 1638, 1639, 1640, 1641, 1642, 16...
see more
Pcc for 17th floor only all units restrooms & hallways renovation on main tower. total # of units for this floor 43. 1701, 1703, 1704, 1705, 1706, 1707, 1708, 1709, 1710, 1711, 1712, 1713, 1714, 1715, 1717, 1719, 1725, 1727, 1728, 1729, 1730, 1731, 1732, 1733, 1734, 1735, 1736, 1737, 1738, 1739, 1742, 1743, 1744, 1745, 1746, 1747, 1748, 1749, 1750, 1751, 1752, 1753, 1755
Pcc for 15th floor only all units restrooms & hallways renovation on main tower. total # of units for this floor 52. units breakdown as per customer matrix as follow below: 1501, 1503, 1504, 1505, 1506, 1507, 1508, 1509, 1510, 1511, 1512, 1513, 1514, 1515, 1517, 1519, 1521, 1523, 1525, 1527, 1528, 1529, 1530, 1531, 1532, 1533, 1534, 1535, 1536, 1537, 1538, 1539, 1540, 1541, 1542, 1543...
see more
Tower.- pcc for 14th floor. the following units are included: 1401,1403,1404,1405,1406,1407,1408,1409,1410 1411,1412,1413,1414,1415,1417,1419,1421,1423 1425,1427,1428,1429,1430,1431,1432,1433,1434 1435,1436,1437,1438,1439,1440,1441,1442,1443 1444,1445,1446,1447,1448,1449,1450,1451,1452 1453,1454,1455,1457,1458,1459 this pcc does not include: 1456