Want a quote from
the Whiting-turner Contracting Co?
We recommend getting 3 quotes
for any construction project.
Use our
free bidding system
to get a quote from the Whiting-turner Contracting Co
+ 2 more of the best.
Their BuildZoom score of 110 ranks in the top 4% of 131,387 Virginia licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring the Whiting-turner Contracting Co, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Pro tip:
We generally recommend hiring a contractor with a score higher than 95.
the Whiting-turner Contracting Co has a BuildZoom score of 110, which places them above 96% of 131,387 contractors in Virginia.
Activity
53 projects
2025
46 projects
2024
40 projects
2023
49 projects
2022
Our building permit records indicate that the Whiting-turner Contracting Co has worked on at least
188.0 projects over the past 3 years.
This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.
Experience
34 projects
New Constructions
33 projects
Commercial Renovations
18 projects
Home Additions
9 projects
Kitchen remodels
Analyzing permits over the last 4 years shows that the Whiting-turner Contracting Co mostly works on
new construction
and commercial renovation
projects.
Pricing
27 projects
< $5k
19 projects
$5k-$20k
13 projects
$20k-$50k
15 projects
$50k-$100k
18 projects
$100k-$250k
15 projects
$250k-$500k
21 projects
$500k-$1mil
47 projects
$1mil+
Value Not Public: 49.0 projects
The typical size of their permits is approximately $200,000. This graph shows the distribution of these job values.
Pro tip:
For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.
Building Permits by the Whiting-turner Contracting Co
*targeted*-*superseded*single tenant phased interior build-out of an existing shell building for use as a data center housing computers related infrastructure and administrative/office areas. office data hall w associated air handling & electrical equipment (phase 1). subsequent data hall area w associated air handling & electrical equipment rooms shall be constructed in successive ph... see more
Interior demoliton - regulus global - *** interior demolition is restrcted to the removal of non-bearing walls and finishes. no removal of any structural components no removal compromise or blockage of any fire protection devices. no alteration or removal of sprinkler systems alarms or smoke detection systems. at no time during the demolition process will exits be blocked. all constru... see more
New address: 3600 mount vernon ave. phase 0 - foundation to grade: two levels below grade with part at grade all of which are below podium. these two levels include enclosed parking garage s-2 and some other uses such as m b a-3 s-1 and vestibule elevators stairs for r-2 use above. dsup2021-10012 s/s bldc2023-
New address: 3600 mount vernon ave. phase 0 - foundation to grade: two levels below grade with part at grade all of which are below podium. these two levels include enclosed parking garage s-2 and some other uses such as m b a-3 s-1 and vestibule elevators stairs for r-2 use above. dsup2021-10012 s/s bldc2023-
4100sf to accomodate addition of a third mri system and expansion of the existing waiting room. multiple phases to minimized impact to hospital 1st floor. renovation includes all new finishes inside of the current mri suite new framing new and rework of current mep systems all inside of the mri suite. existing mri 1and 2 will be relocated on concrete slab to make room for the 3rd one
The applicant is allowed to conduct concrete finishing work for the building at 21 w glebe rd for r one (1) month on weekdays monday through friday from monday march 17 2025 through monday april 21 2025 from 6:00pm – 12:00am.the applicant is allowed to perform concrete finishing work like troweling interior to the building’s footprint only but not allowed to use loud noise making equi... see more
Electrical (ug)- independent permit for the installation of dry utilities to include underground pvc raceways for primary power secondary power and low voltage. spring rock green phase i
Tb smith community center is a newly constructed approximately 21, 000 sf building off ruffin road in richmond’s southside. the community center will also serve as an emergency response building with backup generator power and flexibility for the community it serves. the building is two stories and stands 28’ tall. the interior will feature flexible spaces an indoor playground multi-p... see more
Nc - open air precast concrete parking structure located within the springline at district 60 (formerly spring rock green) development on parcel 3. parking structure is 249, 252 ft² and consists of 685 spaces on 5 parking levels with adjacent 102 space asphalt surface lot
The project consists of a lab/office upfit on the fourth floor of the existing biotech 8 building. there are two lab spaces; one will have infrastructure more geared toward heavy chemistry applications. there is an office renovation associated with the one of the labs which includes workstations a meeting room and a conference room. revisions received 8/1/2022. drawing set current as ... see more
Date: (10/13/2025 to 04/06/2025 time: 8:00am to 3:30pm scopes of work includes: curb cut addition of pick up and drop off lane. (tes2025-00848 - make for temp fence only) for the george mason elementary school modernization project. excavation and sidewalk this is a acps project. dsup2025-10001
Requesting a wisp for the diamond district phase 1a roads & unfractured project includes the installation of storm sewer waterline and electrical utilities as well as site lighting hardscapes and paved roadways. to complete this work the existing sports backers stadium will be demolished. adding on a construction entrance as well. ****no surface improvements (e.g curb gutter hardscape... see more
Requesting a wisp for work to occur at the intersection between tredegar st. and s 7th st a boom lift will be placed within the roundabout in order to access the facade of the existing building. flaggers will be utilized with stop slow paddles and signage placed to the work area. work is scheduled to occur over two weekends. (08/02 - 08/03 and 08/09 - 08/10). reference attached mot pl... see more
Temporary closure of 5th street required from bragg st. to tredegar st for tower crane removal from project to occur on one of the following weekends pending weather conditions. april 24th - 27th may 1st - 4th may 8th -11th. the richmond row department and ems services will be notified ahead of the work occurring. reference attached mot plan for the full street and sidewalk closure. 0... see more