Trenching up to 30 depth for the installation of pvc pipe control valves sprinkler heads control wiring etc for irrigation system upgrades
Project name: cob parks (natural resource div.) to construct an irrigation system by hand digging & use of small excavation equipment; install plantings within the median. plantings to be done by volunteer at a future date possibly by april. row permit fee = realtime fees for hourly review & inspection. see conditions & attachments.
Project name: cob parks (various locations) 2004 winter street tree replacement. tree replacement at various locations citywide (site#360, #605, #732, #734, #754, #764, #769, #776, #781, #811). row fees = $-0-. see special conditions and attachments.
This project installs irrigation trees and landscape shrubs in the newly constructed medians along 100th ave ne and ne 1st st at the downtown park
Lakemont orchards leasing office, deck restoration
Project name: standard @ bellevue remove 5 trees.
Project name: renaware removal of 14 trees.
Project name: removal of 1 pine tree - roots are growing close to water li removal of 1 pine tree - roots are growing close to water lines
Type: public works class: stand alone, , remove existing shrub in front beds on south and north of entry. install a 2 tiered block wall and install new landscaping, , project: pleasant bay apartment flg
Cob parks - new irrigation water service
Remove hazardous trees inside the site boundary along s. kent des moines road
Building Type:
Arbor hills hazar...
Construct block retaining wall to rear yard per nov 201192 & construct wall upgrades per engineers report per plan
Project name: tree removal permit to remove 1 tree at trailwalk condominiu, , tree removal permit to remove 1 tree at trailwalk condominiums
Install lawn sprinkler irrigation system; 13 new zones associated with bld05120
Feenix parkside - irrigation dvca ok
Feenix parkside - irrigation
Install lawn sprinkler system
6 ft retaining wall in single family residence