Share your project details and we'll reach out to
Traverse Electric Cooperative Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Traverse Electric Cooperative Inc at PO BOX 66, Wheaton, MN 56296, held a Electrician license (#EA672032) with the Minnesota contractors license board with an expiration date of 02-28-2026. We last verified the license was inactive on 04-19-2026.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 77,973 Minnesota contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our bidding system to be easily matched to qualified, licensed professionals in your area.
Install a 200a feeder with a self meter from an existing service to a trailer panel. install a 200a feeder from the new trailer panel to the new home. install wiring for the well and control. install two circuits for the septic pump and alarm
Upgrade the 100a service equipment to 200a on the utility/transformer pole. trench 200a feeder to the existing single stall garage and wire garage for lights outlets and rv outlets. trench 200a feeder to the existing cabin that is getting a complete remodel. reconnect the well and shore circuits. trench 15a circuits for septic
Replace the 200a meter/main with a 200a all in one. replace an overhead feeder feeding some of the outbuildings with a new underground from the new service equipment. refeed the yard light garage and shop. replace the two fuse boxes in the shop with a single breaker panel
Demolish old 100a service equipment and replace with a new 100a all-in-one. addition a gfci receptacle and a 30a rv receptacle both on the meter pole. trench in a 240v wire to the existing well and install a new subpanel and well controls
Bore in a 100a feeder from the service to the garage. install a 100a panel panel receptacle switch and light. install an air compressor receptacle near the panel. terminate the owner ran receptacle and lighting circuits in the panel
Replace the 100a service and service conductors with a 200a service. trench in a new feeder to a pole sw of the house and install a panel and rv receptacles. trench in a new feeder to an old existing shed east of the service and install a panel a light and switch and a receptacle. owner to wire the rest of the shed
Help the owner install a 200a feeder disconnect trenched in feeder garage grounding electrode system and subpanel in the new detached garage. install two gfci receptacles at the panel. the owner is to wire all the rest of the branch circuits devices and loads
Move the service disconnect from the house to a panel near the new garage. bury an equipment ground from the new service disconnect to the house disconnect and isolate grounds in the house disconnect. addition a breaker panel in the new garage and wire it for lights fans door openers receptacles and an electric boiler
Valuation:
N/A
Permit #:
ELE2310-04475
Status:
final
Fee:
$172
Permit Type:
One-family dwelling
Building Type:
N/A
Electrical permit
6797 760th St, Taylor Township, MN, 56296
2024-01-03
Install a 400a all-in-one panel with an external 200a service disconnect. also installed a panel gfci receptacle. a different electrical contractor has already installed a 200a temporary construction panel and possibly the same contractor is installing the feeders to the house. they may be moving/removing the panel outlet to make room for a 200a meter socket for a submeter to feed a h...
Modify existing raceway and circuits to fit the replacement electric furnace. replace the heat pump disconnect and addition a circuit for the receptacle. wire the replacement heat pump. demolish unused and disconnected wiring. correct load control wiring
Remove the existing house service conductors from the existing service and bury new service conductors directly from the transformer to a new 200a meter socket and refeed the service disconnect
Install a 22kw generator and two 200a automatic transfer switches. re-establish the services in the transfer switches and isolate the grounds from the neutrals in the house panels
Old service was hit so disconnected feeders and replaced service and reconnected the feeders
Valuation:
N/A
Permit #:
ELE2503-01615
Status:
final
Fee:
$50
Permit Type:
Non-dwelling
Building Type:
N/A
Electrical permit
28798 110th St, Rendsville Township, MN, 56248
2024-10-21
Install a new service on a utility pole on the north side of the road trench and bore a feeder to a new tile pump on the south side of the road. wire a disconnect power pump motor and level sensor to the tile pump control
Install a 30a 120v receptacle and a small 2 space rain tight load center with a 30a gfci circuit breaker. mount it all on the same pole as the transformer and service
Install a 100a service on a utility pole. trench in a feeder to the tile pump panel. install circuits to the tile pump control panel and a 20a gfci receptacle
Replaced the overhead feeders from the service to the south barns. replaced the panel at the se cattle shed and refed the panel at the middle silo (power for the sw cattle shed). this is to repair the overhead feeders damaged by the storms from may of this year
The service pole was badly storm damaged. the owner and utility made the decision to move the service to the transformer pole. the overhead and underground feeders need to be moved/extended to the transformer pole. the overhead and one underground will be shortened. three underground feeders will be extended. a portable generator interlock will be added to the service equipment
Trench in a 100a feeder from the service disconnect to the cabin removed the overhead feeder replace the terminal equipment on the outside of the cabin. isolate the neutrals and grounds in the fuse box in the cabin and refeed the fuse box. reconnected the circuits on the outside of the cabin. install a new outside gfci receptacle
Addition a subpanel to ry's service trench in new circuit conductors and install new receptacle switch lights and photocell. the circuit is buried from the new subpanel through the field north of the air strip under cr-18 into the cemetery and terminates at the new switch in front of the american legion memorial and us flag
According to the Minnesota Department of Labor & Industry, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Traverse Electric Cooperative Inc at the Minnesota Department of Labor & Industry.
This is a sample of licensing data; click here to access a complete history.