Share your project details and we'll reach out to
United Life Safety Systems
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 99 ranks in the top 15% of 101,103 North Carolina licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring United Life Safety Systems, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
Expansion into suites 7334 and 7340 from suites 7336 and remove two restrooms. wall demolish. change out finishes. plumbing mechanical and electrical modifications. fire alarm and sprinkler modifications. 7336 to remain the suite address 7200 sf 2-b const m occ abc store #20
First time interior completion for interior design office.849 1- const occ the space includes a mezzanine. existing demising to remain. no change to rated assemblies. new tempered glass wall offices at main level and mezzanine level. new steel framed mezzanine and mechanical platform. new toilet rooms and break area
900sf interior renovation to the second story of the church office area. demolition of drywall partitions ceiling repair and relocation of existing electrical and mechanical fixtures
Expansion to existing tenant site revisions to non-rated construction including new case openings and millwork. revisions to existing plumbing at break room sink and wellness area. mott mcdonald group scope of work includes combining of suites 100 and 101. new suite would be suite 101. scope of work involves new cased openings. minor demolition and relocation of equipment involved. wo... see more
Expansion to existing tenant site revisions to non-rated construction including new case openings and millwork. revisions to existing plumbing at break room sink and wellness area. mott mcdonald group scope of work includes combining of suites 100 and 101. new suite would be suite 101. scope of work involves new cased openings. minor demolition and relocation of equipment involved. wo... see more
Level 2 alteration to demise three vacant tenant offices within existing vacant office. dividing suite 400 into suites 400,430 and 440. 2-a const b occ ste 400=1003 sq ft ste 430=1551 sq ft & ste 440=2313 sq ft b occ no sprinkler
add break room to new suites.
Level 2 alteration to demise three vacant tenant offices within existing vacant office. dividing suite 400 into suites 400,430 and 440. 2-a const b occ ste 400=1003 sq ft ste 430=1551 sq ft & ste 440=2313 sq ft b occ no sprinkler
rework existing ductwork for new unit layouts. no tenant listed.
Lake boone tower 4th floor suites 400, 430, & 440. level 2 alteration to demise three vacant tenant offices within existing vacant office. dividing suite 400 into suites 400,430 and 440. 2-a const b occ ste 400=1003 sq ft ste 430=1551 sq ft & ste 440=2313 sq ft b occ no sprinkler
1, 743 sf interior alteration to ste#280 with new demising wall between 270 and 280. non-rated construction within suite. plumbing hvac distribution electrical power & lighting and fire alar. no fire sprinkler work under this permit. 2-b const b occ no sprinkler
1, 743 sf interior alteration to ste#280 with new demising wall between 270 and 280. non-rated construction within suite. plumbing hvac distribution electrical power & lighting and fire alar. no fire sprinkler work under this permit. 2-b const b occ no sprinkler
Revisions to partitions millwork and doors. patch floor and ceiling to match existing. associated rework of existing mechanical electrical fire alarm & fire sprinkler ste 3330 b occ 2-a const 100 sf
Revisions to partitions millwork and doors. patch floor and ceiling to match existing. associated rework of existing mechanical electrical fire alarm & fire sprinkler ste 3330 b occ 2-a const 100 sf
Revisions to partitions millwork and doors. patch floor and ceiling to match existing. associated rework of existing mechanical electrical fire alarm & fire sprinkler ste 3330 b occ 2-a const 100 sf
Revisions to partitions millwork and doors. patch floor and ceiling to match existing. associated rework of existing mechanical electrical fire alarm & fire sprinkler ste 3330 b occ 2-a const 100 sf
Revisions to partitions millwork and doors. patch floor and ceiling to match existing. associated rework of existing mechanical electrical fire alarm & fire sprinkler ste 3330 b occ 2-a const 100 sf
Level 2 alteration to demise three vacant tenant offices within existing vacant office. dividing suite 400 into suites 400, 430 and 440. 2-a const b occ ste 400=1003 sq ft ste 430=1551 sq ft & ste 440=2313 sq ft b occ no sprinkler
1, 743 sf interior alteration to ste#280 with new demising wall between 270 and 280. non-rated construction within suite. plumbing hvac distribution electrical power & lighting and fire alar. no fire sprinkler work under this permit
Express - alteration harvest plaza unit # 10 white box merc - occ ii-b const 1727sf tbr overall building 1 story 60, 106sf not a change of use no new exterior work
Express - alteration harvest plaza unit # 10 white box merc - occ ii-b const 1727sf tbr overall building 1 story 60, 106sf not a change of use no new exterior work