×

We'll help you find the right contractor.

Share your project details and we'll reach out to Unknown Unknown so you don't have to.

We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.

Get Started
Is this your business? Claim now >

Location and Projects

Address
Fullerton, CA, 00000
Use our bidding system to request a quote

Unknown Unknown Site Work Contractor

Their BuildZoom score of 0 does not rank in the top 50% of California contractors.

If you are thinking of hiring Unknown Unknown, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.

Unknown Unknown Services

Start a project today:

Unknown Unknown Contact Information

Unknown Unknown Fullerton

Quality

Alert*
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
*No active license on file. If you are Unknown Unknown, click “This is My Business” to update your information.

Activity

33 projects
2025
11 projects
2024
74 projects
2023
Our building permit records indicate that Unknown Unknown has worked on at least 118.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

3 projects
New Constructions
57 projects
Excavation and grading projects
Analyzing permits over the last 4 years shows that Unknown Unknown mostly works on excavation and grading project and new construction projects.

Pricing

5 projects
< $5k
1 project
$100k-$250k
Value Not Public: 101.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Building Permits by Unknown Unknown

Sort by: Notable Notable | Date Date | Job Value Job Value
Permanent water - new water service
2024-10-05
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. installation of new 8 public water line including new meters for domestic and i... see more
Valuation:
$169,290
Permit #:
WAT-2024-0018
Status:
expired
Fee:
$1,853
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2024-03-12
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap new/existing 8"pvc and install... see more
Valuation:
N/A
Permit #:
WAT-2024-0017
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2025-04-03
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. installation of new 8 public water line including new meters for domestic and i... see more
Valuation:
N/A
Permit #:
ENG-2024-0121
Status:
expired
Fee:
$1,624
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2024-03-07
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 c.i.p. and install ... see more
Valuation:
N/A
Permit #:
WAT-2024-0015
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2025-03-19
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 8 d.i.p. and install ... see more
Valuation:
N/A
Permit #:
WAT-2024-0014
Status:
complete
Fee:
$6,157
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2024-03-05
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 d.i.p. and install ... see more
Valuation:
$0
Permit #:
WAT-2024-0013
Status:
approved
Fee:
$0
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2025-12-18
Trench/excavate per city standard 312 to hot tap existing 8 d.i.p. and install new 1 service with 1 domestic meter per city standard 601 and abandon the existing 3/4 and return old meter to the city per city standard 646. meter will be provided and installed by city. for precon and inspection contact pete acosta (714) 732-9060
Valuation:
$0
Permit #:
ENG-2024-0112
Status:
issued
Fee:
$1,624
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2024-03-05
Trench/excavate per city standard 312 to hot tap existing 6 c.i.p. and install new 1 service with 1 domestic meter per city standard 601 and abandon the existing 3/4 and return old meter to the city per city standard 646. meter will be provided and installed by city. for precon and inspection contact pete acosta (714) 732-9060. click “next”
Valuation:
$0
Permit #:
ENG-2024-0111
Status:
approved
Fee:
$0
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2024-11-13
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 cip and install (3)... see more
Valuation:
N/A
Permit #:
WAT-2024-0011
Status:
expired
Fee:
$9,718
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2025-05-12
Trench/excavate per city standard 312 to hot tap existing 6 c.i. to install (3) new 1 services and (3) 1 residential fire meters for 3 new adu's and upgrade existing meter assembly by installing a customer shut off valve per city standard 601. new meter and service location will be determined by inspector in the field. city will provide and install new meter. for precon and inspection... see more
Valuation:
N/A
Permit #:
ENG-2024-0085
Status:
expired
Fee:
$1,572
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2025-01-25
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 d.i.p. and install ... see more
Valuation:
N/A
Permit #:
WAT-2024-0010
Status:
expired
Fee:
$6,156
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2025-07-24
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 d.i.p. and install ... see more
Valuation:
N/A
Permit #:
ENG-2024-0078
Status:
expired
Fee:
$1,624
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2025-01-15
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 d.i.p. and install ... see more
Valuation:
N/A
Permit #:
WAT-2024-0009
Status:
complete
Fee:
$7,320
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2025-06-03
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 d.i.p. and install ... see more
Valuation:
N/A
Permit #:
ENG-2024-0075
Status:
complete
Fee:
$1,624
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2025-01-26
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 c.i.p. and install ... see more
Valuation:
N/A
Permit #:
WAT-2024-0008
Status:
expired
Fee:
$6,364
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2025-07-25
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 312 to hot tap existing 6 c.i.p. and install ... see more
Valuation:
N/A
Permit #:
ENG-2024-0070
Status:
expired
Fee:
$1,624
Permit Type:
N/A
Building Type:
N/A
Excavation permit (in city right of way) - initial submittal
2025-05-23
Upgrade curb ramp on northeast corner of houston ave and entrance to parking lot as indicated on exhibit. traffic control per ca mutcd and watch manual. fullerton pd will not enforce no parking signs if not posted 72 hours prior to work. work hours are 7am to 4pm. please contact the city inspector pete acosta at 714-732-9060 for a pre-construction meeting prior to any work being perfo... see more
Valuation:
N/A
Permit #:
ENG-2024-0066
Status:
expired
Fee:
$11,000
Permit Type:
N/A
Building Type:
N/A
Permanent water - new water service
2025-10-15
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 313 remove existing 8 water main and replace ... see more
Valuation:
N/A
Permit #:
WAT-2024-0007
Status:
issued
Fee:
$104,084
Permit Type:
N/A
Building Type:
N/A
Encroachment permit - excavation - water
2025-10-15
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to be added to the permit per water inspector’s evaluation of existing meter assembly. trench/excavate per city standard 313 remove existing 8 water main and replace ... see more
Valuation:
N/A
Permit #:
ENG-2024-0051
Status:
issued
Fee:
$1,624
Permit Type:
N/A
Building Type:
N/A
Permanent water - water upgrade
2024-01-17
Before any work is to begin contractor must schedule a preconstruction meeting with the water inspector for all parts and location approval. * upon completion of the preconstruction meeting additional work/parts may need to added to the permit per water inspectors evaluation of existing meter assembly. trench/excavate/backfill per city standard 312 to install new 1 service with 1 rfm ... see more
Valuation:
N/A
Permit #:
WAT-2024-0005
Status:
filed
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # 833408
117
BZ Score
$130
Avg Project
-
Projects
License # 1066998
120
BZ Score
$6.8K
Avg Project
-
Projects
License # 984824
116
BZ Score
$106K
Avg Project
-
Projects

Unknown Unknown Reviews

BuildZoom hasn't received any reviews for Unknown Unknown. Click here to be alerted when reviews are posted about them.
Please write a review about Unknown Unknown
1 Rate this contractor
Click stars to rate
2 Provide a detailed review of this contractor.