Underground Utility Contractor
New property 2317 SW 61 AVE MIAMI FL 33155 to be connected for the first time to M-D WASD.
The developer is required to install a water main along one entire boundary of the property, as per M-D WASD Rules & Regulations, Section 2.02(1) and 2.04(2)(d).
Therefore, the developer shall connect to an existing twelve (12)-in. water main (E 4327-3) in S.W. 24th St. and S.W.
61st Ave. and extend an eight (8)-in. water main northerly along S.W. 61st Ave. to the northwestern corner of the property.
For this type of development (SFR), there will be no proposed public water main extensions within the property.
Could you please send over a quotation for this job?
Developer needs this information by Thursday 12/11/2025 afternoon since there are major decisions to make on Friday morning.
Feel free to...