Electrical Work
Electrical services were disconnected when the trailer was removed.
From the pole, a drop feed for 200 amp service is needed to the location of the RV port (to be built).
Need a 50/30/20 panel with the capability to expand to future permanent residential
Need projected cost for site development
I am currently staying at Upper Cumberland RV Park.
Please let me know if this is something you can assist with. Thank you!