Solar Installation
Installation Summary
Scope of Work: ESS Battery Backup
Full Details here:
https://docs.google.com/document/d/1ioWhTQKv44goaEOd74zOOLeZ0luLBODbCWNtf7FvcwI/edit?usp=sharing
----------------------------------
1. Exterior wall (house)
Install MID /ATS Switch (EG4 GridBoss), supply-side tap between meter and main service panel, 200A disconnect between MID and main panel.
2. Interior Garage Wall
(25 feet from main panel crawlspace: AC connection to GridBoss)
Install inverter (EG4 FlexBoss21) and 3 batteries on garage wall.
Connect PV inverter, PV, ESS Commission
Support County Inspection & PG&E PTO.
3. Roof PV Installation
Install 18 Aptos 550 W modules/ 4 arrays on 3 sections. IronRidge XR100 rails with QuickBolt SCS hooks ≤ 48″ O.C.
PV home run (50 ft 10 AWG) the attic from junction...