Commercial Renovation
Sealing back of building and installing back exit door and stairwell (one story). We need 3story structure made weather tight on South side and to have an exit door and stairwell installed on the 1st floor with egress down one story (also on South side/side facing railroad tracks). If you're interested, please reach out. Thank you!