76 - 100 of 474 experts
NGH
get quote
PWC
get quote
PCR
get quote
SOC
get quote
MEI
get quote
Notable project: (Combination. 2290 Silver Stone St, Royal Oaks, CA, 95076). Construction of a 2, 804 sq ft single family dwelling with a 930 sq ft garage 10 sq ft covered porch. (on vacant lot)
ISL
get quote
Ihc Solutions LLC
BZ SCORE: 94
MV
get quote
Miguel Valle
BZ SCORE: 93
WCB
get quote
ML
get quote
Notable project: (New residential detached accessory structure - plan check-permit. 275 Imogene Way, Ramona, CA, 92065). Cross street:thomsen wy. activity code:42rp12 42r112 description of work:swimming pool for existing single family dwelling *call customer when final for 90 days they would like to keep our set of plans....760-788-7225..cag***
RSL
get quote
GT
get quote
Notable project: (Plumbing. 19100 Allendale Ave, Saratoga, CA, 95070). Plumbing
LL
get quote
Lee Landscaping
BZ SCORE: 93
Notable project: (Building/electrical plumbing mechanical/temporary power/new. 4280 E 3rd Ave, Napa, CA, 94558). Main dwelling: temporary service-200 amp electric permit fire damage
GGI
get quote

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.

ML
get quote
SC
get quote
Sbk Construction
BZ SCORE: 93
HCI
get quote
TB
get quote
Titanium Builder
BZ SCORE: 93
JB
get quote
Jaso Builders
BZ SCORE: 93
J
get quote
Jardinland
BZ SCORE: 93
HJC
get quote
Notable project: (Building/non-residential/building/alteration. 100 Swan Way, Oakland, CA, 94621). Interior alterations per plans dated 6/24/94
HH
get quote
Harry Hatch
BZ SCORE: 93
36.0 Total projects
Notable project: (Commer, bldg: cdd -building. 3200 E 8th Rd, Stockton, CA, 95212).
FD
get quote
Francisco Dorado
BZ SCORE: 93
Notable project: (Residential alteration. 22283 De Anza Cir N, Cupertino, CA, 95014). Bathrm remodel contractor: dorado tile
PRC
get quote
JCI
get quote
GCH
get quote
Gary C Hardy
BZ SCORE: 93

Recent Kitchen and Bathroom Remodels

95023
Residential
Shower Vanity Remodel
The shower is to be replaced. The old shower has already been removed. The cultured marble shower pan and wall panels have been purchased and are on site. The foundation is concrete and the shower drain will require some concrete work to position it properly for the new shower pan. Leveling the concrete will be required. A pony wall will be installed along one end of the shower. The framing has been done but not installed. The plumbing for the new shower will be at the opposite end of the shower from the old shower. Cutouts from the excess cultured marble will be cut to size and edge polished for window edging and a countertop on a bathroom cabinet. Water proofing will need to be installed around shower area. Some drywall will need repair/replacement from removal of the old tile. Drywa...
95023
Residential
Bathroom Remodel
Bathroom remodel. Take out tub-convert to shower only. If you're interested, please reach out. Thank you!

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.