Whole Home Remodel
New house with one 2x6 wall on the walkout basement foundation. Walkout has been changed from back side of house to the left side of the house as you're facing the front door (Left). House plans came with materials list which I will have on site including windows and exterior doors. No basement windows on the back of house due to the change in walkout to left side. Basement rooms and bathroom framing, then engineered I-beams as floor joists. Some steel beams with posts in the drawing to support upper floor. Need to start around October 1st or 2nd week.
If you are interested in this project, please reach out. Thank you!