126 - 150 of 692 experts
MDP
get quote
Molinaro David P
BZ SCORE: 92
5.0 Total projects
LW
get quote
Lee Wei
BZ SCORE: 92
6.0 Total projects
Notable project: (Commercial alteration / tenant improvement. 6533 Sierra Ln, Dublin, CA, 94568). Change of occupancy from a-2.1 to i-4 to accomodate daycare for children and adults. business will be sublet to cast (creative autism solutions team). no building or structural improvements proposed.
TSH
get quote
21.0 Total projects
Notable project: (Bldg-addition. 4126 S Arlington Ave, Los Angeles, CA, 90008). Addition to church (new area 9100 sf) addition of 1st floor will be finished addition of 2nd floor shell only.(note: fire dept set hand-carriedto fire dept ctr. alteration to change existing construction type to type v-1 hr
GKK
get quote
17.0 Total projects
Notable project: (Bldg-alter/repair. 3415 W 43rd Pl, Los Angeles, CA, 90008). Facade improvement non-structural: re-stucco as req'd. (3) new awnings #3411 1/2 - 3415 (2) @ 4 x 2'-6 & 33.8 x 2'-6 all projecti ng 4'-6 & 8 ht to the bot of framing w/12 max valence. sec.grille @ #3415 12'-9 x 8'-6 & #3413 14.8 x 8'-6
JJ
get quote
Jay Jamshasb
BZ SCORE: 92
7.0 Total projects
TRW
get quote
Notable project: (Bldg-alter/repair. 10010 N Helen Ave, Sunland, CA, 91040). Supplemental to pcis# 07010-10000-00883 to re-check the plans due to major changes additional floor area and to check roof trusses for new 2 story single family dwelling with attached garage on lot # 3*** this is part 1 of 2 permits ***see the original permit application for the permit issuance
ZB
get quote
46.0 Total projects
Notable project: (Bldg-alter/repair. 6515 N De Soto Ave, Canoga Park, CA, 91303). Remodel portion of facade remove (e)mansard roof raise portion of parapet height over entrance doors relocated kitchen in (e)culture center. no chang in use/occupancy/floor area/parking
LAJ
get quote
Low A John
BZ SCORE: 92
Notable project: (Nonbldg-new. 8900 N De Soto Ave, Canoga Park, CA, 91304). Remove (e) asphalt install three (n) concrete pads & anchorage for (n) equipements within (e) maintenance yard & (n) bollards (max. 4'ht.): [1] 18'-4"x37'-4 (power module 60, 000 lbs) [2] 18'-4"x3'-0 (nitrogen tanks 2, 000 lbs) [3] 8'-8"x14'-8 (cooling module 3, 850 lbs)
BDM
get quote
Brian D Miller
BZ SCORE: 92
20.0 Total projects
RLL
get quote
6.0 Total projects
VJB
get quote
CLE
get quote
NKE
get quote
Nam Kenneth E
BZ SCORE: 92

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.

AD
get quote
Amano Daichi
BZ SCORE: 92
AJG
get quote
DWL
get quote
Notable project: (Zon clr homeocc: home occupation exemption. 1038 Clark St, Santa Rosa, CA, 95404). Home office for consulting
LM
get quote
Li, Mai
BZ SCORE: 92
CDT
get quote
6.0 Total projects
Notable project: (Building permit. 536 S West St, Anaheim, CA, 92805). Residential remodel (str): add interior door to convert existing dining room to bedroom (#4). frame in wall between kitchen and new bedroom.
HCJ
get quote
Notable project: (Building. 2300 Harbor Blvd, Costa Mesa, CA, 92626). 17, 254 sf tenant improvement rite aid provide new full height wall adjacent to existing pharmacy area to create a consultation room new low wall to create a new waiting area new soffit above cooler area minor electrical work for 2 outlets and 1 switch. no
JAC
get quote
Joseph A Castner
BZ SCORE: 91
CS
get quote
Charna Sohrab
BZ SCORE: 91
Notable project: (Bldg-alter/repair. 19600 S Western Ave, Torrance, CA, 90501). Teanat improvement : non-bearing partitions and ceiling: change of use from warehouse/storage to office in part of existing warehouse building. (affected area: 35000 sf in 2-story at two locations ) 70 additional pkg required
RTW
get quote
Ruder Timothy W
BZ SCORE: 91
KEH
get quote
Keith E Hempel
BZ SCORE: 91
WKA
get quote
Notable project: (Bldg-alter/repair. 8500 N Balboa Blvd, Northridge, CA, 91325). Tenant improvement. to portion of (e) bldg: work includes to addition new walls fixtures finishes to update mechanical & electrical systems to accomodate new layout and to create upgrade office manufacturing and storage areas. addition roof members to support (n) rooftop equipments and max 1 ton hoists. change... (more)

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.