Bathroom Remodel
Bathroom Renovation - Chapman Lake
March 2025
Second floor full bathroom, 66" by 95"
Remove sink, bathtub and toilet (toilet to be re used)
Remove linoleum floor, prep and level floor, install subfloor for tiling
Tile floor using same tile as master bathroom tile (26 pieces remain)
Install new vanity and accessories as well as vanity lights and mirror in same spot. install toilet in same spot
Remove and replace ceiling fan and light
Install new tub with shower and faucets on right side
o Move piping to right side (current pipes are subject to freezing in crawl space)
o Install access panel with shut off valves in hallway
Tile from tub to ceiling-replace drywall as required for tiling surface
Replace door and hardware
Repair/repaint walls and replace/paint trim or install waterproof pane...