Lvl Header Installation
I have a ~12 foot wall with 3 doors on it. I'm looking to replace the 3 doors with 2 pocket doors. There is a jack studs where one of the doorways was installed supporting an original horizontal beam. I want to install an LVL header sistered to the beam and then move the doorway studs so that the pocket doors are in the middle of the wall.
If you are interested in this project, please reach out. Thank you!