Flatwork Concrete
Remove and replace the proper grade eight-inch-deep at the deepest point of the concrete floor slab within a warehouse to receive selective pallet racking. Suggesting saw cuts, removals, or replacements to lessen the seismic impact on the remaining floor area. A site visit would definitely be required to fully describe the scope of the project and to view any possible challenges. If interested, please contact me. Thanks!