Ridge Beam and Roofing Work
Scope of work:
1. Remove the existing tile roof, remove the existing roof ridge beam at the middle of the house and replace it with a 5.25"x16" LVL beam, fasten the roof rafters to the new LVL beam, and install a new tile roof with an ice and water shield membrane.
2. The roof ridge beam deflected approximately 3" due to overloading and should be replaced.
3. If the drainage is an issue on the flat roof, the roof can be removed and replaced with the proper slope achieved by installing recovery board below the TPO roof.
If interested, please contact me. Thanks!