51 - 75 of 911 experts
SS
get quote
25.0 Total projects
Notable project: (Building. 32 Cornell St, Arlington, MA, 2474). Demolish existing porch and building a new 7'6 x 24 2 story porch and inclosed second floor strip and re- roof
BBI
get quote
Bond Bros Inc
BZ SCORE: 100
27.0 Total projects
Notable project: (Sidedep. 278 Babcock St, Boston, MA, 2215). Sidedep: sidewalk deposit during construction of the new balance field this is not a permit to excavate and/or occupy deposit will be returned if restored sidewalks and ramps meet city of boston standards permit $60.00
MSP
get quote
Mucio S Pires
BZ SCORE: 97
28.0 Total projects
Notable project: (Building permit. 131 Suffolk Rd, Chestnut Hill, MA, 2467). 3rd floor bathroom remodel. remove old tub shower and building new shower toilet and sink stay in same location
CI
get quote
8.0 Total projects
aR
get quote
a&t Remodeling
BZ SCORE: 94
6.0 Total projects
SCI
get quote
56.0 Total projects
Notable project: (Building (1 and 2 family dwellings). 1 Walden Mews, Cambridge, MA, 2140). Replace 21 existing windows with pella pro-line windows. all windows to remain in existing location
AB
get quote
Anthony Barone
BZ SCORE: 99
52.0 Total projects
Notable project: (Building permit. 36 Plainfield St, Waban, MA, 2468). Repair and replace roof
SFH
get quote
Notable project: (Use of premises. 30 Harvard St, Dorchester Center, MA, 2124). Driveway approval in conjunction with pwd approval for curb cut* off street parking for two motor vehicles
SLL
get quote
Salvatore L Longo
BZ SCORE: 98
13.0 Total projects
Notable project: (Residental building permit. 1 Riverview Blvd, Unit 5, Methuen, MA, 1844). 10 x 18 shed in parking space outside building. # 5
LBS
get quote
Leonardo B Silva
BZ SCORE: 98
Notable project: (Short form building permit. 56 A Russell St, Charlestown, MA, 2129). Strip &; reroof
CT
get quote
5.0 Total projects
KB
get quote
13.0 Total projects
Notable project: (Building (multi-family). 11 Tufts St, Apt 6, Cambridge, MA, 2139). Strip walls for new wiring insulation & drywall
JFH
get quote
John F Harman
BZ SCORE: 98
93.0 Total projects
Notable project: (Long form/alteration permit. 1144 Adams St, Dorchester Center, MA, 2124). Existing two;( 2 );family dwelling.; extend living space into attic master bedroom and bathroom addition 4 skylights remove old stairs and addition 36 inch wide stairs insulate install electrical wiring and fixtures addition central air conditioning drywall. plaster paint flooring

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.

PS
get quote
Paul Smith
BZ SCORE: 98
16.0 Total projects
WW
get quote
Walter Westcott
BZ SCORE: 98
3.0 Kitchen remodels
3.0 Multi-room remodels
JJG
get quote
John J Grant
BZ SCORE: 98
4.0 Total projects
KEM
get quote
Karla E Mahuchy
BZ SCORE: 98
APC
get quote
Andrew P Collins
BZ SCORE: 98
37.0 Total projects
Notable project: (Building permit. 88 Crescent St, Auburndale, MA, 2466). Special permit #318-14 - renovation of existing building and new attached garage addition; (2) new attached single family dwellings with attached garages. hers rater needed for the 2 rear units must have required basement egress
WTP
get quote
Wagner T Pinheiro
BZ SCORE: 98
67.0 Total projects
Notable project: (Short form building permit. 345 Commonwealth Ave, Boston, MA, 2115). Remodeling of existing kitchen remodeling of existing bathroom update plumbing and electrical, closet/office new trims new trims replacement of 03 windows prep and paint.unit 7
RMC
get quote
57.0 Total projects
Notable project: (Electrical. 6 Cutler Ave, Cambridge, MA, 2138).
DMG
get quote
Daniel M Galvin
BZ SCORE: 97
30.0 Total projects
EM
get quote
Erik Mendiola
BZ SCORE: 97
17.0 Total projects
Notable project: (Building permit. 20 Lodge Rd, West Newton, MA, 2465). Remodel kitchen baths hvac systems roof siding windows and remove exterior chimney
BR
get quote
Ben Rogan
BZ SCORE: 97
Notable project: (Long form/alteration permit. 338 Newbury St, Boston, MA, 2115). Install a staircase to connect first and second floors. construct dividing walls and bar on second floor. renovate two (2) existing second floor restrooms and addition one (1) restroom on the second floor for a total of three (3) restrooms. install two (2) handwashing sinks one (1) mop sink and one (1) three bay... (more)
ACF
get quote
Antonio C Ferraz
BZ SCORE: 97
8.0 Total projects
CC
get quote
Cag Contracting
BZ SCORE: 97
3.0 Total projects

Recent Work in Medford

$100-$250K
02155
Residential
Home Addition
Adding two rooms and one deck. If you're interested, please reach out. Thank you!

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.