Bathroom Remodeling
Mostly complete designs for hall bath and master bath. Cabinets, mirror tiles, countertops, toilets, and fixtures have been acquired.
Need help with design of MB shower entry and other smaller items.
Need to start asap. Hoping to complete by Nov 25. Both baths on the same 2nd floor.
If interested, please get in touch with me. Thank you!