Electrical Work
The purpose of these 3 activities is to increase energy efficiency:
1. Replace a half dozen exterior light fixtures to motion activated LEDS
2. Upgrade to programmable/ smart thermostats
3. Hardwire installation of a Siemens 240-volt Level 2 charger, VersiCharge charging station
It requires a 40-amp breaker and draws up to 30 amps.
https://a.co/d/92YcApI
I am only available on weekends. I would like to have this work completed in July 2025.