Residential New Construction
It’s a brand new home to be finished for move in on March 14. It just needs a few additions, as I listed. Also needs: front screen door, garage sink, hang up one cabinet in garage, simple coated 5 or 6- 5’ shelves hung in the primary closet for shoes and misc, the other cabinets mentioned are additional for kitchen and to be shakers (5’ wide x 72” H approx. with drawers on bottom and doors on top half or in some similar fashion.
Some misc and other small items needed too.
Garage is a square 19x19. Picture attached.
Flooring has been measured by builder and is 501sf for all 3 bedrooms allowing for closets. New carpet, pad and tack strip need to be pulled 1st. I’d be ordering 535sf or so just to be safe. Large 9”x 6’ interlocking planks most likely. Pic of bedrooms attached. Pretty...