Electrical Work
-I need an electrical
run from the panel to the new
air conditioner condenser.
-Have the disconnect and whip and condenser in place.
-It's about a 30 foot run,
and we'll need a new breaker,
open ceiling in the basement.
-I would like to get
completed
as soon as possible.
If you are interested in this project, please reach out. Thank you!