New Sewer System
My leach lines are saturated, and Todd Christenson drew up plans. I have had a soil inspection done and have filed the plans with the county, waiting for a bid.
The plans are at the county. I am keeping my existing tank but need to install a pump and whatever else the plans call for. I have no idea what the cost is going to be, so how can I give a budget? I do need it done ASAP, right? now I have an open hole in my yard. Todd took the plans to the county, and I never saw them.
Please let me know if this is something you can assist with. Thank you!