Bridge Foundation Work
We are looking for a bridge to be reconstructed at Charlotte Harbor Preserve State Park. It is close to our park office here in Punta Gorda. The existing bridge would have to be disassembled. It needs a concrete foundation at each end for the new joists. There would be about 7 pressure treated 2 x 8 joists. We can supply 2 by 6 composite boards for decking. New handrails would have to be built to about 4 ft.; we could supply the boards. We like the bridge 4’ inches above ground level with a ramp to avoid flooding. If you're interested, please reach out. Thank you!