Bathroom Remodel
We are looking to have some bathroom remodeling done in Rochester 55902, beginning around Aug 12th. The information:
Condo unit built in 1974, on the 2nd floor. Stairs are straight shot up, no turns or landings.
2 baa straight
1. Mup, with bathroom—(a) remove tub and surround, install walk-in shower and surround; (b) remove toilet, install new toilet; (c) install new waterproof vinyl tile flooring on top of existing tile flooring; (d) remove existing vanity with single sink, install new vanity with single sink.
2. Second bathroom - (a) remove tub and surround, install new tub and surround, (b) remove toilet, install new toilet, (c) install the same waterproof vinyl tile flooring over the existing tile flooring, (d) remove existing vanity with single sink, install new vanity with sin...