Electrical Work
Good Morning, if interested can you please provide a quote for the following scope of work?
-Remove an existing 100A Panel/socket combination
-Install new 200A shut off switch/entrance
-Install new 200A panel wire in same location as existing 100A panel
-Install new EG4 Gridboss wall mounted and wired between switch and panel.
-Gridboss wiring will be limited to connecting to grid, the rest will be installed by others.
The 'EG4 gridboss', switch, socket, and new main-panel are on-Site already and specs are provided in the drawing below. Wiring and conduit will be required.
If you are interested in this project, please reach out. Thank you!