Electrical Work
Added a 28x32 living unit/cottage on top of a garage.
(Use 10 gauge extension cords - run from our house/cabin - for the framing.)
Now ready to begin wiring.
I have put a deposit down with HEA to add a second meter on the outside of the garage wall.
At the very least I need to install a meter box (with a generator cut-out switch) plus two interior panels for breakers: one downstairs for the garage and one upstairs for the cottage.
Available to meet starting mid-next week,
Please reach out if you can help. Thank you.