Remediation
This is my home and I plan on moving there when this is work is done.
We have removed a foot of gypsum board at all walls in order to dry everything out.
You will have the remove it from four feet A.F.F. at all walls and replace with wonder board ( cementitious rock ) taped, spackled. and caulked at bottom.
Bare concrete will be epoxied and will come up the walls with a 12 inch high cove base also in epoxy. Pattern and tone
T.B.D.
Kitchen base cabinets are to be removed and replicated exactly only in marine plywood, original doors to be rehung on cabinets once reinstalled.
Bathroom walls removed and rerocked in wonder board taped and spackled and tiled. Tub will not be replaced but walk in shower will be installed.
All doors and door trim and jambs are to be replaced with PVC
I...