Electrical Work
400 amp electrical service: Provide and install a 320 amp rated meter can, installed with two 200 amp exterior disconnects. Provide and install two 200-amp load centers. New riser pipe to overhead line from power company.
Update grounding.
Add EV Charger Circuit
Run 60amp rated EV circuit for NEMA 14-50R Plug (about 40 feet, no digging)
If you're interested, please reach out. Thank you!