Electrical Work
Scope of Work:
Install a 200-AMP pedestal (already on hand) for underground 200-AMP service.
Relocate the disconnect to the new location at the pedestal.
Run conduit and wiring to the interior service cable junction box.
Upgrade service from the existing 60 AMP to the 200 AMP panel already in place.
Please let me know if this is something you can assist with. Thank you!