Steel Pipe Replacement
The Hardison ditch is trying to replace 130 ft+/- of 8 inch steel pipe along the edge of the river. This is on the property of Tony Diaz. The 20 foot (or longer if possible) lengths need to be reached out 30 feet from the rig. Fruit Growers Supply is working a bid and they need a crane in the area.
If you are interested in this project, please reach out. Thank you!