Home Remodel
The property has been gutted to the studs. Will need to raise the floor ~30 inches on one side. Will need to add brand new electric service as the electric has been gutted (would like to increase to 400A from 200A). Will need to add new rough plumbing to convert old kitchen to utility room and old bathroom to kitchen, plus add two new 3/4 baths. Frame out new rooms as plans depict.