Generator Hook Up
1. From the existing meter, remove the conductors feeding the existing 200 A / 208 V panel and reroute to new ATS. The ATS is proposed to be mounted on the exterior wall adjacent to the meter.
2. From the generator power conductors (conductors are routed to the basement space adjacent to the ATS), connect to the ATS.
3. From the generator control conductors (conductors are routed to the basement space adjacent to the ATS), connect to the ATS
4. From the ATS, install conductors to the existing distribution panel.