• About BuildZoom
  • BuildZoom Data
  • Find a Contractor
  • Permit Map

BuildZoom News & Analysis

Articles about the housing market in the USA and Homeowner Guides

  • Home
  • Building News
  • Analysis
  • Economic Indicators
  • Rankings
  • Homeowner Guides
  • Other Resources

Tesla Gigafactory Update: Construction Costs Top $1.3 Billion

February 12, 2018 by Kelsey Graeber 2 Comments

 

Tesla Gigafactory BuildZoom
Source: Tesla

This is an update to our previous posts on the Tesla Gigafactory. You can read our Feb 2017 Update and our June 2016 Update by clicking on the links.

It’s been an entire year since we last covered construction updates from the Tesla Gigafactory under development in the Tahoe-Reno Industrial Center (TRIC) near the aptly-named city of Sparks, Nevada. In recent days, TRIC was in the news for having completed the sale of a 67,125-acre parcel to Blockchains, LLC, a technology company that incubates and develops blockchain-related ventures. As we await further information on Tesla’s new neighbor, we analyzed 2017 permits to assess the progress of the Gigafactory itself. 

Despite having completed much of the structural work prior to 2017, the project clipped along, adding more than a hundred permits for a total of 255 permits by the end of 2017. These 112 new construction permits represent costs of $379.9 million of the $1.3 billion filed to date. 

According to the permits, most of the new development appears to be taking place within the existing factory footprint or as an addendum to previous permits. While some of the new installations represent typical manufacturing apparatus (e.g., multiple conveyor systems), much of the new equipment is emblematic of a higher-tech, Tesla-worthy operation. A few of the more interesting additions include the following:

    1. A metrology lab (November 8, 2017)
    2. A brazing oven to automate metal joining (November 8, 2017)
    3. $179,850 for a hazmat building addendum (November 1, 2017)
    4. $13.7M for hot oil skid systems to store and transfer heat fluids (March 13, 2017)
    5. $10.8M for air separation yards to separate atmospheric air into elemental components
    6. $2.6M for chiller yards to remove heat from liquids

You can view all of these building permits on our property page for the Tesla Gigafactory here.

Another trend evident in 2017 was a high occurrence of project addendums. In the new wave of 2017 updates, 50 of the 112 issued permits were addendums to previous permits, accounting for changes valued at $165.6 million. As mentioned in our early 2017 piece, an addendum is a supplemental permit that makes changes to a previous permit filed for the project. The value of these permits are the additional construction costs incurred to make these changes.

You can view the top-20 most expensive construction permits for 2017 below:

 

Filed Under: Building News Tagged With: auto, car, Construction, nevada, sparks, tesla, tesla gigafactory

About Kelsey Graeber

Having grown up in Los Angeles and studied in New York, Kelsey is fascinated by how the built environment shapes our understanding of people, culture, and well-being. Her work is at the intersection of design, research, and marketing. She enjoys traveling, reading, and eating food that requires chopsticks.

Comments

  1. David says

    February 12, 2018 at 11:49 pm

    Very interesting and informative.

    Reply
  2. SupremeRenovation Construction New York says

    June 22, 2018 at 8:39 am

    It’s a shame you dоn’t һave a donate button! Ӏ’d certainly donate
    to thiѕ superb blog! І suppose for now i’ll settle foг book-marking and adding ʏour RSS feed tο
    my Google account. Ӏ look forward to brand neԝ updates ɑnd ԝill talk
    aЬ᧐ut thіs site with myy Facebook gгoup.
    Talk sооn!

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our mailing list

* indicates required

Unlock the power of BuildZoom Data.

Data on every licensed contractor in the US and 350M+ building permits.

Apply for Data Access >

About BuildZoom:

BuildZoom has analyzed nearly 6 million contractors and over 350 million building permits to help you find the perfect general contractor for any type of remodeling project. Hire a great contractor through our bidding system.

About BuildZoom

  • About BuildZoom
  • BuildZoom Data
  • Privacy Policy
  • Terms of Service
  • Careers
  • Contact
  • Find a Contractor

  • San Francisco Contractors
  • New York Contractors
  • Los Angeles Contractors
  • Chicago Contractors
  • Boston Contractors
  • Seattle Contractors
  • All Locations
  • BuildZoom

    © 2023. All Rights Reserved.
    301 Howard St.
    San Francisco, CA 94105

    Copyright © 2026 · Magazine Pro Theme on Genesis Framework · WordPress · Log in

    Let Us Know Your Contact Details and We'll Add You to Our Subscription
    Please enable JavaScript in your browser to complete this form.
    Name *
    Loading