×

Don't wait to get a Plumber

We make finding a plumber fast, easy, and commitment-free.

Call now (623) 745-8065
  • Local & Qualified
  • Rapid Connection by Phone
  • Commitment-Free Calls
Is this your business? Claim now >

Location and Projects

Address
201 NE Woodbury Dr, Grain Valley, MO, 64029
Use our bidding system to request a quote

A Bright Plumbing,LLC

A Bright Plumbing,LLC, 201 NE Woodbury Dr, Grain Valley, MO (Employees: Bright, Jamie and Dale G Richardson) holds a Contractor / Craftsmen License license and 2 other licenses according to the Missouri license board.

Their BuildZoom score of 108 ranks in the top 5% of 23,328 Missouri licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring A Bright Plumbing,LLC, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.

A Bright Plumbing,LLC Contact Information

Phone: (816) 210-4014 Edit
Address: 201 NE Woodbury Dr, Grain Valley, MO 64029 Edit

A Bright Plumbing,LLC Grain Valley

Quality

108
95th percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
A Bright Plumbing,LLC has a BuildZoom score of 108, which places them above 95% of 23,328 contractors in Missouri.

Activity

133 projects
2025
134 projects
2024
158 projects
2023
Our building permit records indicate that A Bright Plumbing,LLC has worked on at least 425.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

199 projects
New Constructions
4 projects
Commercial Renovations
376 projects
Plumbing projects
128 projects
Sewer laterals
Analyzing permits over the last 4 years shows that A Bright Plumbing,LLC mostly works on plumbing project and new construction projects.

Pricing

22 projects
< $5k
3 projects
$100k-$250k
Value Not Public: 373.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Building Permits by A Bright Plumbing,LLC

Sort by: Notable Notable | Date Date | Job Value Job Value
Excavation for water pipeline
2025-09-16
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02818
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-05
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02403
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-04
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01308
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-10-06
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-04786
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-10-06
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-04786
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-11-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03891
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-05
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
$0
Permit #:
PW-EXC-2025-02653
Status:
issued
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Building permit - residential
2025-03-04
New house. unfinished basement. covered patio
Valuation:
N/A
Permit #:
PRRES20250692
Status:
approved
Fee:
$10,475
Permit Type:
New single family
Building Type:
N/A
Excavation for water pipeline
2024-04-01
Renew expired excavation - pw-exc-2023-02157 since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01020
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-07-18
Insufficient bond amount renew expired permits for 4 water and and water connections since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-00228
Status:
issued
Fee:
$1,336
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-12
Traffic control permit required for excavation work. 3/4 x ; 3/4 dom svc;5/8 mtr outside 4” san swr conn insp water exc san swr exc cpbr-2023-00840
Valuation:
N/A
Permit #:
PW-EXC-2025-02733
Status:
issued
Fee:
$343
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-10-25
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01910
Status:
expired
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-08-21
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01768
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-10-17
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01759
Status:
expired
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-10-13
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01758
Status:
expired
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-09-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01715
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-09-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01699
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-09-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01710
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-10-06
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01619
Status:
expired
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-10-06
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01609
Status:
expired
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # LIC-12-23-0064
118
BZ Score
-
Avg Project
-
Projects
License # CLCL10044316-09-2020
117
BZ Score
-
Avg Project
-
Projects
License # TC-0230
126
BZ Score
-
Avg Project
-
Projects

A Bright Plumbing,LLC Reviews

BuildZoom hasn't received any reviews for A Bright Plumbing,LLC. Click here to be alerted when reviews are posted about them.
Please write a review about A Bright Plumbing,LLC
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.