Share your project details and we'll reach out to
Break Through Construction
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Break Through Construction at 8221 Balboa Ave, Stockton, CA 95209, held a General Contractor license (#1036642) with the California contractors license board with an expiration date of 03-31-2026. We last verified the license was expired on 05-16-2026.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 336,931 California contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.
Worst contractor ever. Do not hire this company. I had Matt renovate one of my apartments in 2018 and he did a terrible job. He painted the walls with only one coat of paint - no primer, over charged for anything he had to buy, installed wrong things that were discussed prior to signing the contract and took over 6 months to renovate a studio apt. Don’t give this guy your money!
Please write a review about Break Through Construction
Voluntary code case job. fill in basement(flood zone) legalize 326 sf. addition consisting of bedroom laundry room restroom and hall. new structural beam at addition where previous wall was removed. install new 8 garage door in existing detatched garage. all subtrades included
Addition of 2 bedroom 1 bathroom and 1 play room (732 sf) addition new furnace. customer to bring in shear transfer detail @ truss over wall between (e) & (n) from engineer for review/approval before calling for shear inspection
1. revert non-permitted conversion of rear detached garage space [ 22ft x 26 ft] into 2nd living unit with unpermitted bathrm kitchen & bedroom. 2. remove non-permitted 112 sq ft addition to the garage. 3. obtain permit for [5[] non-permitted windows in garage to remain
In kitchen: remove & replace kitchen sink & upgrade electrical r & r disposal in same location. sanitary sewer replacement in hall bath: remove tub & replace with shower pan remove & replace toilet & sink in same location addition exhaust fan. remove & replace furnace in attic. repipe residence with copper. remove & replace water heater in same location
Bathroom remodel to include r/r shower (pre-cast shower pan) sink and toilet in same location and also addition gfci (no structural). r/r water heater and also gas pipes and flue to both water heater & furnace in same location (no change-out of furnace). addition gfci to kitchen and replace electric line to garage with iunderground conduit
Remodel to master bathroom and to hall bathroom to include r/r fixtures in same location addition (2) receptacles and addition (1) new light. remove kitchen hood and addition microhood in same location. r/r furnace (fau) in same location & addition air conditioning coil (for future a/c)
Kitchen remodel: r&r kitchen sink, r&r range hood. master bathroom remodel: r&r sink, toilet, and shower. r&r two wall heaters. r&r water heater. revised, add new recp'ts in kitchen, add ceiling fan in din. rm, change electric service panel to 100a. 1nov02, rf. hall bathroom remodel: r&r sink, toilet, and bath tub.
Kitchen remodel to include: replace wall furnace range hood replace main elect panel rewire exterior lamp fixture addition gfi recepticle extension addition dedicated cir for extension. air conditioning elect circuits to code for counters and replace kitchen sink
Interior remodel to include r/r sink range hood and addition 2 circuits in kitchen. r/r water closet tub/shower combo and sink in master bathroom. install gfi in hall bathroom. r/r water heater and r/r 2 wall furnaces. all change-outs in same location
Re-roof of a single family residence. in hall bathroom replace tub faucet and replace exhaust fan and light. in master bathroom replace shower pan faucet and sink. in kitchen replace sink and water supply line 1 copper from meter to main valve. replace range hood. upgrade kitchen counter circuits with g.f.c.i. recepticles. install new flouresecent lamp. in garage replace forced air fu... see more
1) r%r wall furnace same location 2) r&r; water heater same location 3) r&r; hood sink 4) addition of disposal and dishwasher 5) r&r; sink same location in bathroom addition exhaust fan/light (hall) 6) r&r; water closet and addition exhaust fan/light in master bathroom 7) remove tub and replace with shower 8) upgrade to gfi in hall and master bathroom
1)copper re-pipe of kitchen 2nd story bathroom laundry. 2) water heater r&r same location 3) addition new wall furnace on second story. 4) second story bathroom remodel (r&r tub vanity water closet) 5) first story bathroom remodel (r&r water closet and vanity)
Eletrical plumbing and mechanical for misc. remodel work. scope of work consists of r & r existing wall furnace at same location in living room. scope also includes r & r (1) kitchen sink (1) bathroom sink and re-wire kitchen
Kitchen remodel (minor alt) to include r/r sink dishwasher and stove in same location. remove kitchen hood and replace with microhood in same location. install switches and receptacles to current code
Install 1 gfi receptacle at garage & rewire 1 exterior front light at garage. replace drain to washer machine& replace kitchen sink. install a new fuseble switch to furnace & replace furnace
Kicthen remodel. scope of work consists of new sink, re-wire, r & r dishwasher and disposal, and remove existing 3'x3' window and replace with new garden window (same size - no header change).
According to the California Contractors State License Board, the status of this license was at one point cancelled. However, this information may have changed.
Check this license's status for Break Through Construction at the California Contractors State License Board.
This is a sample of licensing data; click here to access a complete history.
Worst contractor ever. Do not hire this company. I had Matt renovate one of my apartments in 2018 and he did a terrible job. He painted the walls with only one coat of paint - no primer, over charged for anything he had to buy, installed wrong things that were discussed prior to signing the contract and took over 6 months to renovate a studio apt. Don’t give this guy your money!