Share your project details and we'll reach out to
Cannilla James Anthony
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Cannilla James Anthony at West Islip, NY 11795, held a Architect license (#012350) with the New York contractors license board. We last verified the license was inactive on 03-05-2026.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 77,888 New York contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.
Plumbing - alteration type 2 remove existing partitions and toilets install new parttions and toilet s roof top hvac units exhaust systems sprinkler fire-alarm creating a nw u ited states postal facility. no changes to egress in existing warehouse/office and mezzanine
Alteration type 2 - mech/hvac remove existing partitions and toilets install new parttions and toilet s roof top hvac units exhaust systems sprinkler fire-alarm creating a nw u ited states postal facility. no changes to egress in existing warehouse/office and mezzanine
Alteration type 2 - construction equipment - fence remove existing partitions and toilets install new parttions and toilet s roof top hvac units exhaust systems sprinkler fire-alarm creating a nw u ited states postal facility. no changes to egress in existing warehouse/office and mezzanine
Alteration type 2 - gen construct remove existing partitions and toilets install new parttions and toilet s roof top hvac units exhaust systems sprinkler fire-alarm creating a nw u ited states postal facility. no changes to egress in existing warehouse/office and mezzanine
Alteration type 2 - sprinkler remove existing partitions and toilets install new parttions and toilet s roof top hvac units exhaust systems sprinkler fire-alarm creating a nw u ited states postal facility. no changes to egress in existing warehouse/office and mezzanine
plumbing- alteration type 1 alteration to existing building, addition of an entrance canopy a covere mailing (loading berth) platform and a covered carrier platform for a new post office as per plans filed herewith
Plumbing - alteration type 1 alteration to existing building, addition of an entrance canopy a covere mailing (loading berth) platform and a covered carrier platform for a new post office as per plans filed herewith
Alteration type 1 - alteration to existing building, addition of an entrance canopy a covere mailing (loading berth) platform and a covered carrier platform for a new post office as per plans filed herewith
Plumbing - alteration type 1 remove existing partitions, toilets, store fronts & rooftop unit; install new structural beams & cols partitions finishes, new toilets jan.clos, new hva and exhaust systems windows loading be rth, handicapped ramp & steps w/platform at entrance for a new post office as per plansfiledherewith
Alteration type 1 - remove existing partitions, toilets, store fronts & rooftop unit; install new structural beams & cols partitions finishes, new toilets jan.clos, new hva and exhaust systems windows loading be rth, handicapped ramp & steps w/platform at entrance for a new post office as per plansfiledherewith
Plumbing - alteration type 2 install new gypsum board partitions doors and frames acoustic tile hung celings resilient tile floor counter toilets janitor's closet alum and glass vestibule hvac system. no change in occupancy. new building fi le in 1990-#941-90
Alteration type 2 - construction install new gypsum board partitions doors and frames acoustic tile hung celings resilient tile floor counter toilets janitor's closet alum and glass vestibule hvac system. no change in occupancy. new building fi le in 1990-#941-90
Alteration type 2 - mech/hvac install new gypsum board partitions doors and frames acoustic tile hung celings resilient tile floor counter toilets janitor's closet alum and glass vestibule hvac system. no change in occupancy. new building fi le in 1990-#941-90
Alteration type 2 - construction equipment - fence convert two existing stores into a new post office with gypsum board partitions, hung ceilings counter, toilet & janitor's closet, storefront, havc system. no change in egress use or occupancy
Alteration type 2 - construction equipment - fence convert two existing stores into a new post office with gypsum board partitions, hung ceilings counter, toilet & janitor's closet, storefront, havc system. no change in egress use or occupancy
Alteration type 2 - gc removal and relocation of interior partitions plumbing fixtures and mechnaical ductwork in existing medical offices on the second floor. no change in occupancy use or egress. new gas meter in cellar and new air conditioning unit with steel dunnage on roof for same
Alteration type 2 - mech/hvac removal and relocation of interior partitions plumbing fixtures and mechnaical ductwork in existing medical offices on the second floor. no change in occupancy use or egress. new gas meter in cellar and new air conditioning unit with steel dunnage on roof for same
Plumbing - alteration type 2 removal and relocation of interior partitions plumbing fixtures and mechnaical ductwork in existing medical offices on the second floor. no change in occupancy use or egress. new gas meter in cellar and new air conditioning unit with steel dunnage on roof for same
According to the New York Office of the Professions, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Cannilla James Anthony at the New York Office of the Professions.
This is a sample of licensing data; click here to access a complete history.