Don't wait to get a Plumber

We make finding a plumber fast, easy, and commitment-free.

Call now (623) 745-8065
  • Local & Qualified
  • Rapid Connection by Phone
  • Commitment-Free Calls
Is this your business? Claim now >

Location and Projects

Address
14001 Century Lane, Grandview, MO, 64030
Use our bidding system to request a quote

Century Plumbing Company

Century Plumbing Company, 14001 Century Ln, Grandview, MO (Owned by: Todd A Rosenfelt) holds a Contractor / Craftsmen License license and 6 other licenses according to the Missouri license board.

Their BuildZoom score of 108 ranks in the top 5% of 23,328 Missouri licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Century Plumbing Company, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.

Century Plumbing Company Contact Information

Phone: (816) 765-6066 Edit
Address: 14001 Century Lane, Grandview, MO 64030 Edit

Century Plumbing Company Grandview

Quality

108
95th percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
Century Plumbing Company has a BuildZoom score of 108, which places them above 95% of 23,328 contractors in Missouri.

Activity

55 projects
2025
67 projects
2024
81 projects
2023
Our building permit records indicate that Century Plumbing Company has worked on at least 203.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

55 projects
New Constructions
4 projects
Commercial Renovations
168 projects
Plumbing projects
54 projects
Sewer laterals
Analyzing permits over the last 4 years shows that Century Plumbing Company mostly works on plumbing project and new construction projects.

Pricing

10 projects
< $5k
5 projects
$5k-$20k
Value Not Public: 165.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Building Permits by Century Plumbing Company

Sort by: Notable Notable | Date Date | Job Value Job Value
Excavation for water pipeline
2025-09-15
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02139
Status:
complete
Fee:
$522
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-08-07
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02112
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Excavation for sanitary sewer
2025-09-08
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02029
Status:
complete
Fee:
$2,441
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-08
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01903
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Building permit - residential
2025-09-08
Finish carriage house loft with a bedroom bathroom kitchenette living area and laundry. finish basement with a bedroom bathroom kitchenette and rec space. **new house permit needs to have final occupancy inspection before permit can be inspected for final completion - see attached list for house occupancy andrea sessler 02/21/2025 12:51 pm
Valuation:
N/A
Permit #:
PRRES20250541
Status:
issued
Fee:
$782
Permit Type:
Alteration single...
Building Type:
N/A
Building permit - residential
2025-03-30
New house - finished and unfinished basement - covered deck - owner builder stop work order generated on 10/28/2024 12:00 am by username mitchell schwarz. stop work order removed on 11/19/2024 12:00 am by username shawn hoffman. stop work order generated on 07/30/2025 12:00 am by username dustin agcopra. stop work order removed on 07/30/2025 12:00 am by username dustin agcopra
Valuation:
N/A
Permit #:
PRRES20244922
Status:
issued
Fee:
$10,582
Permit Type:
New single family
Building Type:
N/A
Excavation for water pipeline
2025-10-13
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-04610
Status:
complete
Fee:
$200
Permit Type:
N/A
Building Type:
N/A
New service line work - water sewer or storm
2025-05-06
Pw-exc-2025-02164 should be cancelled. see: pr-uc-2025-00057 for correct paid excavation permit. 8x6 li tee conn w/2 svc 2 meter and 2 rpz bfp w/exc - paseo green
Valuation:
N/A
Permit #:
WS-PW-PR-2025-00598
Status:
approved
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-11-08
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-03767
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-10-15
No traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. if two-way directional traffic flow cannot be maintained contractor shall obtain traffic control permit via compass kc for work in roadway prior to performing excavation work. 12x6 fp tee conn w/6 dc bfp w/exc - cooper's hawk -3” dom rpz bfp and 1” li rpz
Valuation:
N/A
Permit #:
PW-EXC-2024-03550
Status:
complete
Fee:
$334
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-09-27
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-02974
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-09-03
Since work is on residential street and contractor has annual traffic control stickers no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic... see more
Valuation:
$0
Permit #:
PW-EXC-2024-01147
Status:
issued
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Excavation for sanitary sewer
2024-08-28
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01019
Status:
issued
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-02-29
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-00858
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-02-29
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-00855
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-07-31
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-00422
Status:
issued
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-06-15
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01862
Status:
complete
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-08-25
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01594
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-06-30
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01587
Status:
complete
Fee:
$598
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-03-27
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-04917
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # LIC-12-23-0064
118
BZ Score
-
Avg Project
-
Projects
License # CLCL10044316-09-2020
117
BZ Score
-
Avg Project
-
Projects
License # LIC-05-24-0049
126
BZ Score
-
Avg Project
-
Projects

Century Plumbing Company Reviews

BuildZoom hasn't received any reviews for Century Plumbing Company. Click here to be alerted when reviews are posted about them.
Please write a review about Century Plumbing Company
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.