Share your project details and we'll reach out to
DK Mechanical Contractors Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
DK Mechanical Contractors Inc at 1261 N LAKEVIEW #J619, Anaheim, CA 92807, held a Engineer license (#617227) with the California contractors license board with an expiration date of 01-01-2015. We last verified the license was inactive on 06-09-2026.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 336,931 California contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.
Supplemental permit for (2) additional gas outlets (cheese melters). eliminated (1) toilet and (1) urinal in the men's restroom. revisions to cold water sizing based on original plan check under 11042-10000-07143 (5 psi/100ft)
Kearny mesa: building approval for a second floor tenant improvement consisting of outpaitent surgery/oshpod/offices first generation tenant improvement. il-2-1/pid 96-7585 fire brush zones 300 buffer fire: vhfhsz esl aia faa. (oshpd-3 project)
New plumbing installation for a 3 story over 2 level parking for a private educational facility. included potable water medium pressure gas waste with acid neutralization tanks sewage/sump pumps. 4 inch meter with 4 inch bacflow preventor
This permit does not include the helliport. the helliport will be under a separate plan check and permt. - installing 1269 fixtures 32 industrial equipment items 26 gas system items and 51 drain & waste system items. (foundation only permit). - other fixtures: 1 dishwasher 1 pre-rinse dishwasher 1 ice maker 3 make up for evap coolers 1 steam kettle 1 soda dispenser 1 drop in warmer 1 ... see more
Install new plumbing system for cheesecake factory space # k90. a= 3.70 psi./100ft (cold water) b= 5.0 psi/100 ft (hot water) friction loss. 178/143 psi. @ 190 feet. 2-inch water meter 3-inch backflow preventer installed. rp not required. permit under 05042-90k-00054
Plan check for revisions made to hot and cold water lines of a 16 story high rise building (305 units) including booster assembley verification, new p.r.v. scedules and pipe sising per 75% loading for branches. also variations in mpg riser diagram. permit for adding irrigation yard piping to 8" domestic underground upstream of the 8" domestic r.p.( irrigation r.p. backflow prevention ... see more
Water supply/distribution waste/vent elevator pit drains (detail 1 only). new 2 story office building. 86/73 psi. plan divided into phase 1 and phase 2. phase 1: 2 inch water a = 2.70 psi/100 ft. phase 2: 2-inch water meter b= 3.30 psi/100ft. applicant will resolve elevator pit drain detail 2 in a seperate plan check
Plancheck only for alterations to approved plans due to existing field conditions. altered gas piping (inspector to verify existing gas seizmic shut-off valve on main supply. water system changes (removed 2 r.p. & p.r.v, (inspector to verify existing 3 r.p. & p.r.v.)
Parking structure with 3 domestic meter and 2 1/2 r.p. backflow prev. device. 2 6 domestic meters for future use each with 6 r.p. backflow prev. devices. scope of work is up to 5 outside building footprint.yard piping is not included in this application.(sewer engineering number and approved civil site plan for proposed sewer laterals is required prior to connection to street sewer in... see more
Supplem. application for as built plans for parking structure with 3 domestic meter and 2 1/2 r.p. backflow prev. device. 2- 6 domestic meters for future use each with 6 r.p. backflow prev. devices. scope of work is up to 5 outside building footprint.yard piping is not included in this application.(sewer engineering number and approved civil site plan for proposed sewer laterals is re... see more
Complete plumbing for a 5 story commercial builing 4 water meter with 4 rp device. water sizing is based on 1.5 psi/100. domestic booster pump duplex tigerflow model no. es-3000. 220 gpm @ 25 psi booster. future gas system is not part of this plan check approval. waste vent & water system for future is plan checked for common system. robert j. knoedler m.e. california lic.# 31582
Plumbing system in a hi-rise adaptive resue building. comply with department order dated 8/1/02. permit will expire 30 days from issuance date. 4 existing meter rp backflow protection. new booster pump system. sized on 6.29 for prv zones 1, 2, 3 and 8.57 psi/100 ft for 4, 5. mod issued to omit traps and vents from floor drains in garage
Install new plumbing fixtures on first second and third floors of equinox fitness clubs under tenant improvement. a 6 water meter is existing. a separate application plumbing plans and permit shall be required for public pool. piping in juice bar has been revised. plumbing plans have been updated
Plancheck and permit for rainwater drainage system (roof parking structure site decks filteration system...) see permit # 06042-10003-16032 for contractor clarification. dk mechanical is responsible for all rainwater drains inside building and on roof. bali construction inc. is responsible for all onsite rainwater drainage system outside the building
New plumbing for adaptive reuse building. there are a total of 251 lofts. approval shall cover waste/vent system water supply/distribution system fuel gas sysetm and rainwate system. also included in this plan is a booster pump system (for water suppl/distribution) and two sewage ejectors. civil site plan also included in this package. 84/68 psi. 6 inch water meter. a1 = 2.2 psi/100ft... see more
Plan check for revisions made to waste system. added a grease interceptor for a restaurant and changed sewaje ejector to accomodate for new incoming loads. waste lines are not overloaded based on what was previously approved and the new discharge rate of pump (320gpm@32ft head)
Alterations to approved plans for the new spa area plumbing.added new boiler 200 gal. storage tank & exp. tank on roof to supply 110 deg. and (future 140 degree water to spa, new mpg service and gpr for boiler. structural approval for roof pad is in process(approx. 3500 lbs) pressure vessell permit required for 750 mbh boiler
General Engineering, General Building, Boiler, Hot Water Heating And Steam Fitting, Fire Protection, Warm Air Heating, Ventilating And Air Conditioning, Plumbing
Business Type
Corporation
According to the California Contractors State License Board, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for DK Mechanical Contractors Inc at the California Contractors State License Board.
This is a sample of licensing data; click here to access a complete history.