Dpw Inc, 203 E Harris Ave, South San Francisco, CA (Employees: Donald Stanley Pheil, Jorge Manuel Gordils, and Philip Robert Carlevaris) holds a Boiler, Hot Water Heating And Steam Fitting, Plumbing license according to the California license board.
Their BuildZoom score of 113 ranks in the top 3% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Dpw Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Work category: 5p; block 8721 lot 011 - 5th fl. - north - m and w's core rr's mother's room (2) cond. lines. 5th fl. -south - m and w's core rr's agr wellness room sk (1) cond. line micro kitchen. work on the 5th fl of an existing 6 styory commercial offcie building
Work category: 5p; (l1-s)- 42 fs/fd 15 gas appl 22 sk 40 kea gnr's crr's 3 cd gwh's in ph air conditioning w 8 ol 6 rp's gt se's dbp. (l1-n) - crr's lr-rr's 1 wh 1 mk w rp 1 ck w rp wh & gt 2 cd 4 fd/fs. ( l-2 3 4 ea-s)- crr's gnr's mk wr 2cd (l-2 3 4n) - crr's gnr's mr 2 cd. ( l2 only- cb cafe nb 12 fd/fs 6 gas appl rp
Work category: 5p; work to be done on the 3rd floor: 9 floor sinks 2 floor drains 2 roof receptors 1 grease trap 2- 120 gal water heateres 6 backflow preventers connection to the following equipment by others: 1 mop sink 1-3comp sink 3- hand sink 3 trough drains 1 soiled dishtable 2 exahust hood drains 1 wash control cabinet. 1- breakroom sink with backflow for water dispenser
Work category: 5p; cws/r lines to two wshp's one in line condenser water pump install control valves on 41 existing relocated hvac induction units at the building perimiter. disconnect/reconnect hac piping to these units. work on the 35th floor
Work category: 11p; decommission/remove an existing 3/4 watts #009-m3qt rp serial #167022. this devise is located under the 8th fl wellness room sink and served an hvac unit on the 7th floor that is being eliminated. work on the 8th fl
Work category: 5p; block 8721 lot 011 - 6th fl -south - core m and w's rr's (2) agn rr's mothers room sk storage room sk (1) cond line micro kitchen. work on the 6th fl of an existing 6 story commercial office building
Work category: 5p; work to be done on the 16th floor: 1 - break room sink with 1/2 backflow preventer to serve carbonated water dispenser 1-mothers room. base restrooms: replace exiting restroom fixtures
Work category: 5p; 16th/9th/6th floors- same scope for each floor- replace plumbing fixtures and make ada upgrades in the men's and women's core rr's on each floor. work on the 16th 9th and 6th floors of an existing 24 story commercial office building
Work category: 5p; 34th fl - cw line to added appliances in existing bkrm # 3416. 37th fl- pantry #3745- relocates to the other side of wall. modify rough in piping for new sink/appliance locations
Work category: 5p; work to be done on the 2nd floor: 1- breakroom sink with1 backflow preventer serving carbonated water dispenser. 3wc 3 lavies 1 drinkig fountain 1 mop sink & 40 gal water heater
Work category: 5p; this job is at the port at pier 1. description of work - run a cold water line to a coffee maker located near the reception desk at the prologis space at the end of pier 1
Revision to 202303093396: no construction on building work is only at sidewalk. revise basement roof slab design. basement area is used as storage for corner store basement slab is being rebuilt
Work category: 5p; work to be done on ther 5th floor: 2 mothers room sinks 1 inderect air gap and backflow preventer to sever reception water dispenser 2 lavatory sinks in agr restroom existing rough to remain
Work category: 5p; one tenant sink and remove and reinstall 4 sinks and faucets in the core men's and women's rr's on a new countertop. work on the 23rd floor
Work category: 5p; install new sink faucet and instantaneous heater at existing sink location. reuse existing sump pump for the sink. work on the ground floor
Work category: 5p; work to be done on the 17th floor: 2- break room sinks with 3 backflow preventer to serve carbonated water dispensers 1- mother room sink 1- all-gender restroom 1 drinking fountain base rr: rework exiting rough for new fitures: 5 wc 4lavies 2 urinals trap primers to exiting floor drains
Work category: 5m; work to be done on the 13th and 14th floor. 13th floor: connect to existing cws/r futures install 1 circulation pump. extend piping to 1 crac unit that is by others. 14th floor connect to (e) cws/r futures instal 1 circulation pump extend piping to 2 heat pumps that are by others. re-pipe two vav's that are being relocated