×

Don't wait to get an Electrician

We make finding an electrician fast, easy, and commitment-free.

Call now (623) 259-4111
  • Local & Qualified
  • Rapid Connection by Phone
  • Commitment-Free Calls
Is this your business? Claim now >

Location and Projects

Address
Apache Junction, AZ, 85117
Use our bidding system to request a quote

Flatiron Electric Inc

Flatiron Electric Inc, Apache Junction, AZ (Employees: Claude Steven Ross, Debra Lynn Ross, and James Patrick Shields) holds a Specialty Dual license and 1 other license according to the Arizona license board.

Their BuildZoom score of 110 ranks in the top 4% of 71,576 Arizona licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Flatiron Electric Inc, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.

Flatiron Electric Inc Services

Start a project today:

Flatiron Electric Inc Contact Information

Phone: (480) 560-4684 Edit

Flatiron Electric Inc Apache Junction

Quality

110
96th percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
Flatiron Electric Inc has a BuildZoom score of 110, which places them above 96% of 71,576 contractors in Arizona.

Activity

17 projects
2025
18 projects
2024
14 projects
2023
15 projects
2022
Our building permit records indicate that Flatiron Electric Inc has worked on at least 64.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

42 projects
Electrical projects
Analyzing permits over the last 4 years shows that Flatiron Electric Inc mostly works on electrical project projects.

Pricing

9 projects
< $5k
2 projects
$5k-$20k
1 project
$100k-$250k
Value Not Public: 34.0 projects
The typical size of their permits is approximately $3,500. This graph shows the distribution of these job values.
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Flatiron Electric Inc Reviews
5 out of 5 stars, based on 2 reviews

  • By Brian H.
    May 4, 2020
    new underground wiring for AC units

    FlatIron Electric is everything the name implies, they will be around for a long time, as from my experience recently it is a company of worthwhile and determined people, who do their job with pride and the greatest of 'know-how'. I witnessed firsthand the expertise of the gentlemen that were sent out to do work at our home, they had a daunting task in front of them and faced it with resilience in the face of adversity and through pure knowledge and perseverance they were able to do the impossible and in less than 4 hours had located the problem and constructed a solution. I was amazed, not only that - these two guys were quite entertaining, I remember the name of one of them - Brian - I forget the other persons name but that does not lessen his impact in any way. These guys were a great team and knew exactly what they were doing. But most of all, I enjoyed the witty conversation we had about life in general, and I had a little bit of time to get to know them and that was invaluable. I am so impressed by them I want to invite them over sometime with their families to spend an afternoon on the lake. Excellent work, excellent service I would highly recommend this business.

  • May 4, 2016

    Flatiron electric did great work. They are caring people who took care of the problem qukckly. Their work and people were very professional. Thanks, Jim, you and your company are the best!
    Terry and Sheila Ringey
    Tom and aria Timms

Please write a review about Flatiron Electric Inc
1 Rate this electrician
Click stars to rate
2 Provide a detailed review of this electrician.


Building Permits by Flatiron Electric Inc

Sort by: Notable Notable | Date Date | Job Value Job Value
Residential utility repair permit
2025-09-18
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. the act of self disconnecting utility wires or meters is prohibited and may cause damage or injuries. failure to schedule disconnect may result in additional utility trip charge fe... see more
Valuation:
N/A
Permit #:
PMT25-16633
Status:
issued
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-06-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. the act of self disconnecting utility wires or meters is prohibited and may cause damage or injuries. failure to schedule disconnect may result in additional utility trip charge fe... see more
Valuation:
N/A
Permit #:
PMT25-09788
Status:
final
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Construction and trades residential
2025-04-30
Effective building codes: 2018 ibc 2018 irc 2018 imc 2018 ipc 2018 upc 2018 ifgc 2018 ispsc 2017 nec 2018 phx fire code service upgrade per current electrical code. reviewer: phid contact your electric service provider to verify any additional panel requirements description of work: replacing existing 200a ses to 200a; ***** location details: to remain the same
Valuation:
$4,500
Permit #:
CTR-102504288
Status:
final
Fee:
$186
Permit Type:
Repairs replacements
Building Type:
Mobile home
Residential utility repair permit
2025-03-26
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-05504
Status:
issued
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-03-26
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-05503
Status:
issued
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-02-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-00639
Status:
final
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-02-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-00638
Status:
final
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-02-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-00637
Status:
final
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-02-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-00636
Status:
final
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-02-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-00635
Status:
final
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-02-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-00634
Status:
final
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-03-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-03896
Status:
issued
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-03-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-03895
Status:
issued
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-03-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-03894
Status:
issued
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-03-04
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-03893
Status:
issued
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-08-10
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-02416
Status:
expired
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Residential utility repair permit
2025-01-31
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-01491
Status:
final
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A
Construction and trades residential
2025-01-30
Effective building codes: 2018 ibc 2018 irc 2018 imc 2018 ipc 2018 upc 2018 ifgc 2018 ispsc 2017 nec 2018 phx fire code contact your electric service provider to verify any additional panel requirements scope: need existing meter pedestal inspected for aps to re-energize meter at lot 93 reviewer: mbail
Valuation:
$300
Permit #:
CTR-102500178
Status:
final
Fee:
$150
Permit Type:
Repairs replacements
Building Type:
Mobile home
Construction and trades residential
2025-01-21
Effective building codes: 2018 ibc 2018 irc 2018 imc 2018 ipc 2018 upc 2018 ifgc 2018 ispsc 2017 nec 2018 phx fire code contact your electric service provider to verify any additional panel requirements scope: need existing meter pedestal inspected for aps to re-energize meter at lot # 7 reviewer: mbail
Valuation:
$300
Permit #:
CTR-102500176
Status:
final
Fee:
$150
Permit Type:
Repairs replacements
Building Type:
Mobile home
Residential utility repair permit
2025-01-22
Replacement of 200 amp (or less) electric panel - no plans required. installation shall comply with city of mesa codes and servicing electric utility requirements. do not disconnect utility wires or meters. schedule disconnect/reconnect with the serving utility and obtain utility service requirements specific to your permit. failure to schedule disconnect may result in additional util... see more
Valuation:
N/A
Permit #:
PMT25-00641
Status:
final
Fee:
$229
Permit Type:
Replacement of 20...
Building Type:
N/A

Similar Contractors See more

License # 342928
164
BZ Score
$5.2K
Avg Project
-
Projects
License # 335914
130
BZ Score
$1K
Avg Project
-
Projects
License # 324565
128
BZ Score
$3K
Avg Project
-
Projects