×

Don't wait to get a Plumber

We make finding a plumber fast, easy, and commitment-free.

Call now (623) 745-8065
  • Local & Qualified
  • Rapid Connection by Phone
  • Commitment-Free Calls
Is this your business? Claim now >

Location and Projects

Address
1026 W Innovation Drive, Kearney, MO, 64060
Use our bidding system to request a quote

Hampton Plumbing Inc

Hampton Plumbing Inc, 1026 W Innovation Dr, Kearney, MO (Owned by: Jason Barnes,Nate Barnes,Larry) holds a Contractor / Craftsmen License license and 6 other licenses according to the Missouri license board.

Their BuildZoom score of 108 ranks in the top 5% of 23,328 Missouri licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Hampton Plumbing Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.

Hampton Plumbing Inc Contact Information

Phone: (816) 628-6979 Edit
Address: 1026 W Innovation Drive, Kearney, MO 64060 Edit

Building Permits by Hampton Plumbing Inc

Sort by: Notable Notable | Date Date | Job Value Job Value
Excavation for water pipeline
2025-07-18
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02972
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-18
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02958
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-24
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02284
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-10
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01049
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-10
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01048
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-10
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01046
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-10
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01045
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-06-04
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
$0
Permit #:
PW-EXC-2025-00737
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-03-21
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00741
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-12
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03700
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Building permit - residential
2025-08-05
New house. finished/unfinished basement. walk out basement. suspended slab - deferred. 400 amp. covered deck. engineered floor system - deferred. no pool installed with this project. spiral staircase details - deferred
Valuation:
N/A
Permit #:
PRRES20252330
Status:
issued
Fee:
$12,970
Permit Type:
New single family
Building Type:
N/A
Excavation for water pipeline
2024-10-24
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-03473
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-07-18
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01469
Status:
complete
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-04-16
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01311
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-03-29
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01307
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-05-04
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01730
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-13
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-01439
Status:
complete
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-00899
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-03-13
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-00812
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-00666
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # LIC-12-23-0064
118
BZ Score
-
Avg Project
-
Projects
License # CLCL10044316-09-2020
117
BZ Score
-
Avg Project
-
Projects
License # LIC-05-24-0049
126
BZ Score
-
Avg Project
-
Projects

Hampton Plumbing Inc Reviews

BuildZoom hasn't received any reviews for Hampton Plumbing Inc. Click here to be alerted when reviews are posted about them.
Please write a review about Hampton Plumbing Inc
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.