Share your project details and we'll reach out to
House Construction
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 96 ranks in the top 20% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring House Construction, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
House Construction is listed as the contractor for electrical work for JS Sullivan development in San Francisco. If it’s the same “House Construction” then they wired our light switches in the incorrect order (when compared to the lights) and apparently told the developer they weren’t responsible for fixing the issue because it wasn’t a “code violation.” Have heard others in our building who’ve viewed the wiring also found it subpar.
By Iris S.
March 4, 2021
Very professional and very knowledgeable. We have worked with Moti for 5 years on different projects. He is a pleasure to work with and delivers within the time that was discussed! We had reconstruction done at our house: new wiring, plumbing, flooring, central heat and air, painting. Outside he did a curving and stamped concrete path and a pool.
He cares in the 1st place about his clients and their projects, not about his wallet. Would recommend in a heartbeat to anyone!
By Tommy
January 2, 2019
Room addition
$2,100,000
Very nice company to work with and very professional .
Full pc for tenant improvement of floors 2, 4 and 5 in an exising building. this is the 5th floor of the series. service size is 600a 120/240, 3ph, 4w and 400a, 120/240, 1ph 3w. area of scope 6, 265sf. building permit number 19016-10000-22744
Tenant improvement in an existing 5 story building with a new 2 000 amp service with new added load and re-connect to existing load. epc for power and energy. affected area: 7786 sqr ft. bulding permit: 19016-10000-29084
Full plan check for a tenant improvement. scope of work includes new lighting and added circuits to an existing 600 amp distribution board (120/240 v 3-phase 4-wire system) and a panel. total affected area: 6265 sq ft
Building a- construct 3 level building to include (57) mfdwl units tco good till 10/25/2014 deferred #5-submittal for fire pit-issd 5/21/2014 deferred #4-2a-staircases-issued 2/14/14 deferred #3-1a-staircases-issued 2/14/14 9/25/13 deferred #1 truss calcs-issued 10/8/2013 1/16/2014-deferred #2-build carports & trash enclosure-issd 5/21/2014
Building b- construct 3 floors of (17) mfdwl unit tco good till 10/28/2014 deferred #2- staircases - issued 2/14/14 11/26/2013- revision #1- delete the type a window from scope of work addition low slope roof that extends fire rated ceilings-issd 1/16/2014 9/25/13 deferred #1 truss calcs - issued 10/8/2013
Building c- construct 2 floors of mfdwl units (6) tco good till 11/3/2014 5/23/14 - rev # 1 - divide (e) carport in to 2 separate 4 space carports- issd 8/14/2014 deferred #2- staircases - issued 2/14/14 9/25/13 deferred #1 truss calcs - issued 10/8/2013
Retail-construct 7, 000 sq ft of commercial retail space 8/6/2013-revision 1- stuructural calcs and architectural plans-issd 10/16/2013 9/11/14-revision 2: install two one-hour demising walls between tenants- issd 10/3/2014
[eplan] new 4 story apartment building. scope of work includes 800a 240/120v 3ph-4w service distribution power and lighting for new construction. state approved modular units are not in scope of work
To establish an office and warehouse for concrete contractor open storage of recreational vehicles and boats and mini-storage facility. property to be developed in three phases. ***** location: on the west side of south el dorado street south of french camp slough south of stockton
Midway-pacific hy: sign permit to install (1) illuminated wall sign (40 sq ft) for existing retail space "designer rack"/zoned: cc-1-3 **minor plan change - changing the font of the original sign only; 1/2s.f. difference; 07/22/05 - m8t** 8/30/05 change of address from 3683 midway per mark chyrsler
Kearny mesa - installation of 2 illuminated wall signs "san diego community bank" 81 sq. ft (2) 162 total square feet of sign area with 55 lf of store frontage. zone: il-3-1 allowed 3.75 sq. ft. per store frontage (206sf). permit is for wall signs a & b, with a separate electrical permit for sign c
Kearny mesa - installation of 2 illuminated wall signs "san diego community bank" 81 sq. ft (2) 162 total square feet of sign area with 55 lf of store frontage. zone: il-3-1 allowed 3.75 sq. ft. per store frontage (206sf). permit is for wall signs a & b, with a separate electrical permit for sign c
University. signs permit. install one illuminated pole sign 25' high ( stones unlimited sherwin-williams 6080) , one illuminated wall sign 27 sq. ( design center & slabyard) & one non-illuminated wall sign 91.5 sq.( stones unlimited design center & slabyard) to existing commercial building zone il-2-1 w/sdp 41-0485
46 condos/common area-subs listed on this permit. plan ck purpose only extended permit appl till 10/21/06-see individual permits for inspections. quality alarm bl #29948 pd. purcell murphy pd bus lic #29978 afp int'l llc(advantage fitness prod)pd buc lic #29955. rev #08040119. 4/16/8 verifd all subs buc lic inf. posted. title 24 energy forms for bldgs a b c d scanned in by albert.(6/13)
Tenant improvement. plan check for power and energy. first time tenant. rei outlet store. topanga village. (title 24 packet has been attached to the plans)
House Construction is listed as the contractor for electrical work for JS Sullivan development in San Francisco. If it’s the same “House Construction” then they wired our light switches in the incorrect order (when compared to the lights) and apparently told the developer they weren’t responsible for fixing the issue because it wasn’t a “code violation.” Have heard others in our building who’ve viewed the wiring also found it subpar.